600 Alabama Street
Mission · San Francisco, CA 94110
-
1911
Built as an industrial building, recorded as occupied by Inlaid Floor Co.
-
Nov 1993
Parapet corrective bracing.
-
Jun 1999
Seismic retrofit.
-
Mar 2000
Install fire alarm panel, manual pull station, smoke detector.
-
Apr 2001
Umb/revise arch layout of handicap bathroom on 1st floor.
-
Aug 2002
T/i for veterinary clinic permitted use under s.f. planning code no parking req'd under sq ft planning.
-
Apr 2003
Rev. permit application 200208012868. re design of partition layout as noted on drawing.
-
May 2003
Add or relocate fire sprinklers for tenant improvement on 1st fl. total of (15) new & (5) relocate.
-
May 2003
Redistribution & relocation of duct runs to existing approved hvac.
-
Jun 2003
Install new fire control panel &fire protection devices. monitoring & point of connection for waterf.
-
Mar 2004
Install new demizing wall, electrical + plumbing, new cabinets + floor covering. ti work only.
-
Aug 2009
Interior ground floor remodel including reworking of existing storage and laundry rooms in two surgry suits with total area of remodel of approximately 930 s.f. scope includes drywall, flooring, patching, cabinetry, sinks, lighting, oxygen oulet relocation, hvac modification mep uner separate permit.
-
Sep 2009
Remove partial stair, install lift.
-
Sep 2009
Intstall 3 duct heats.
-
Oct 2009
T/i: upgrade on the existing fire sprinkler system; relocate 4-heads to new gyp. ceiling.
-
Nov 2009
Add 2 heads & relocate 1 head total 3 heads. ref permit application 200910169129.
-
Jan 2011
Interior ground floor remodel including the rework of existing shower and existing reline ward into new feline ward with new isolation room approx. 152 sq ft.
-
Apr 2012
Installation of (2) electric sigle faced wall signs.
-
Apr 2012
Installation of 1 projecting sign - electric & double faced.
-
Nov 2013
Replacement of (2) existing hvac roof top units with new like type.
-
Jul 2015
2nd floor t.i. remodel include new treatment room, add 2 mew exam rooms, 2 new storage rooms, new lounge room, relocate manager office and enlarge the dental room. mep and sprinkler plan under separate permit. maher n/a.
-
Nov 2015
Add (7) heads to ti work per nfpa #13 on 2nd floor only. ref ti 2015-0731-3042.
-
Oct 2017
Core & shell upgrades to demolition & reconstruct stairs, offices & restrooms in existing tenant space & create communicating opening to 612-614 alabama street for expansion of tenant space. upgrade ada van parking. ** maher: n/a **.
-
Jan 2018
Ti to add new partitions, doors, millwork and finishes on 1st & 2nd floors. mep systems included. life safety and fire alarm on separate permit. core and shell under pa 2017-1020-1836.
-
May 2022
Property was affected by water damage (2 bathrooms, kitchen and hallway). reinstall demolished tile, drywall repair (less than 50%), reinstall 2 toilets, reslap flooring, install vinyl floor that was damaged. kitchenette cabinets installation, sink installation, adding dedicated electrical line for.
DBI holds 31 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 31.
Not yet documented: the architect and builder and the early tenants. Submit an update