612–660 Alabama Street
Mission · San Francisco, CA 94110
-
1914
Built as an industrial building, recorded as occupied by Pelton Water Wheel.
-
May 1987
Pipe frame canopy, cutting table & fire sheet rock.
-
Nov 1994
Ti, addition locker rooms, office, entry exit, separation wall.
-
Dec 1994
Describes the build-out of the climb wall only, refer#9418949.
-
May 1995
Sprinkler coverage.
-
Aug 2000
Demolition of portion of exist building (se corner) add 3 fls to exist building. grd fl convert to parking.
-
May 2001
Revise to app #200008016642/s2 during demolition it was discovered add'l bracing for shear wall required.
-
May 2001
Addition of low wall climbing structure to existing space.
-
Jan 2002
Design/fabrication and installation of automatic fire sprinkler system per app #200008016642.
-
Jun 2002
Revise 200201076374 design, fabricate, install automatic fire sprinkler system (wet type).
-
Oct 2002
Revise #200206048113/add 14 sprinklers to raised computer floor at 3rd floor.
-
Dec 2002
Provide sprinkler monitorubg system with elevator recall.
-
Oct 2007
Reroofing.
-
Nov 2008
New store front in existing opening & new windows. barrior removal at second means of egress.
-
Jan 2010
Change of use from f-1 (animation studio) over ground floor. garage to b(office use) over ground floor. garage. no proposed construction alteration or improvements except accessibility upgrade - see reference, building is fully sprinklered. see permit application 200008016642-s5/r-2.
-
Mar 2010
Expansion of indoor rock climbing gym. new occupant load.
-
Aug 2010
Build a new (exit only ) corridor wall & stairs (within existing garage space) to replace existing corridor to accommodate future tenant improvement expansion (ref. set permit application 2010-0323-8747.) separate mep if required.
-
Oct 2011
Mission cliffs- interior 3, 000 sq ft expansion of existing rock climbing gymn to adjacent vacant office. change of occupancy from b to a-3.
-
Sep 2012
Scope of work to expand rock climbing gym of (previous issued permit for similar work permit application 201110217391 to be cancelled).
-
Apr 2013
Relocate total 3 of 6 sprinkler heads, ref permit application 2012.09.17.9838.
-
Aug 2013
This is a resubmission, change in design of climbing wall structure only. the change instructure (design) also includes revised foundation design. revsion to permit application 201209179838 per plan.
-
Jul 2014
Install sprinklers above and below new mezzanine area. ref.# 201209179838. maher n/a.
-
Oct 2017
Core & shell improvement to demolition partitions & doors. install new ada hydranlic elevator to accomodate gurney. add fire rated doors, skylights, mechanical & plumbing system improvement. upgrade restrooms & create communicating openning to 600 alabama st to expand t.i. ** maher: n/a **.
-
Jan 2018
Ti to add new partitions, doors, millwork and finishes on 1st & 2nd floors. mep systems included. life safety and fire alarm on separate permit. core and shell under pa 2017-1020-1837.
-
Oct 2023
Reroofing, elastahyde 720 crrc id 0682-003; sr 0.84 te 0.89; roof overlay install class a-1, sbs asphalt roof system @ flat roof only, approx 4, 900 sq ft.
DBI holds 52 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 52. 17 of them are nominal $1 street-space or sidewalk permits.