2169 Folsom Street
Mission · San Francisco, CA 94110
-
1902
Built as an industrial building, recorded as occupied by H. Friedrichs Furniture Factory / Allied Box and Excelsior Co.
-
Oct 1998
One stor-remodel structure to new use, new walls, plumbing/electrical.
-
Oct 1998
One stop-remodel structure to new use, new walls, plumbing/electrical.
-
Oct 1998
One stop-convert building to livework to envelope change.
-
Dec 1998
Emergency repairs to foundation/structural.
-
Dec 1998
Emergency repair foundation permit for annex building only.
-
Dec 2000
Life safety system - strobe horn, s.d. system water flow.
-
Jan 2001
Construction of new mezzanine at 9 studio units & 1 at literary center.
-
Dec 2002
Extension of intermediate lvel to build new water closet. new intermediate lvel at 2nd floor office.
-
Aug 2004
(work at unit # m305 only.) general renovation interiors of bathrooms/bedrooms/living areas and roof decks, seismic reinforcing and horizontal extension onto north roof deck - sprinklers under separate permit.
-
Aug 2007
One unit, live work ti - all new non-structural partitions, remodel 2 exisiting baths, new 45min rated window in south bath. no work in kitchen.
-
Jan 2010
Live work unit m-301. construct partition walls in live work unit to create new office, hallway and bedroom separation as per plans include new lighting and electrical work.
-
Feb 2012
To install a kitchen for a food photography studio. to prepare and photograph food in a studio setting. working area only one story.
-
Sep 2015
Full kitchen remodel to include cabinets, flooring, drywall, & appliances. no structural changes. all lighting to comply with title 24.
-
Jun 2016
3rd floor, unit #m301: interior remodel to existing live/work unit located with in the box factory. remodel includes 1.5 baths add 1 full bathroom, kitchen & stair. maher na.
-
Sep 2016
Tenant improvements for a new office at 1st floor of 2 story building. adding 2 sinks and cabinetry. n/a for maher.
-
Mar 2017
Unit m301: minor exterior alterations: (2) new skylights, new outdoor shower, widen existing door 9". n/a for maher.
-
Aug 2017
1st floor: bathroom remodel. no wall modification. no structural work.
-
Mar 2018
One unit: remove existing roofing (deck). flat roof, install 1/4 nonprime dens deck & 60 mil ib roof system, remove/reinstall siding and new stucco siding at exterior & nonstucco on side of roof deck railing to match existing. new deck. maher ord 155-13 na.
-
Nov 2020
No.building: interior upgrade to a 382sf commercial space; remodel of existingloft ladder and sheet medeal flooring at loft, structurl upgrade to loft structure, new spiral stairs and guardrail, minor lighting replacement, modification to existing sink counter.create space of existing loft into legal story-level.
-
Apr 2021
Reroofing.
-
Apr 2022
#m205: interior cosmetic remodel of 2nd floor loft. no structural work or changes to exterior walls or windows. replace kitchen cabinets and appliances, replace bathroom fixtures and tile, replace door to unit from hallway, replace l.v. transformers.
-
Jul 2022
Reroofing.
-
Jun 2025
#m102: toilet relocation; millwork replacement in kitchen with new sink & faucet.
-
Aug 2026
Unit m305: master bathroom remodel like for like. no structural changes, no removal of walls, replace toilet, vanity. upgrade mep to code as needed.
DBI holds 84 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 84. 13 of them are nominal $1 street-space or sidewalk permits.
The survey's data table dates the building to 1902; the context statement's appendix dates it to 1899-1913. Not yet documented: the architect and builder and the early tenants. The assessor dates the building to 2001; the city's 2011 survey of Showplace Square and the northeast Mission dates it to 1902. Submit an update