2130 Harrison Street
Mission · San Francisco, CA 94110
-
Jul 1984
New construction wood frame.
-
May 1986
Enclose existing shed.
-
Jul 1988
Addtion of 2nd fl, to be warehouse.
-
Jan 1998
Erect a three story 26 unit live/work plus 2 commercial building.
-
Nov 1999
Fully sprinkle new construction-867549-under construction.
-
Nov 1999
Fire alarm, smoke detector, pull station, sprinklers flow.
-
2001
Built as an apartment building, recorded as occupied by Mariposa & Harrison Lofts.
-
Apr 2001
To erect wall sign.
-
Apr 2006
To comply with nov#200067045: relocating washer/dryer, adding shower at bath#2. adding closet below roof stair and misc non structural, plumbing & electrical work. complying with n.o.v#200667045.
-
Jul 2008
Install new gas fireplace and interior decorative windows in loft.
-
Sep 2010
Revision to application #201006033741. increase cost of construction by an additional $7000.
-
Jun 2011
Tie into existing 1 1/2 fire sprinkler line in closet and run 1" mic t to 2 hsw heads under loft.
-
Sep 2013
One unit- install new kitchen counter top and appliances, install new hardwood flooring with 5 mm rubber underlayement, remodel 2nd fl bath, new closet, add recessed lights, paint units.
-
Dec 2014
Remove & replace siding in like kind at south of building. approx 1000sf. paint to match existing.not visiting from street. to comply with nov# 201414581 dated 12/23/14.
-
Jan 2016
One unit: first floor - replace vanity/vanity light/toilet/fixtures. install new pre fab shower kit. second floor - replace vanity/vanity light/toilet/fixtures. install 2 new shower valves. replace tile on floor and walls on both bathrooms.
-
Oct 2018
Remove all the walk pads from existing roof membranes surfaces. conduct on-site roof moisture survey. afterwards, install walking pads in same location.
-
May 2019
Remodel 1st fl bathroom. remodel and increase size of mezzanine bathroom.
-
Jun 2019
Reroofing.
-
Sep 2020
Repair roofdeck, less than 50%.
-
Oct 2020
One unit: remodel ktichen, 2 bathroom & bedroom. maher n/a.
-
Oct 2020
Rebuild existing roof decks & walkways, guardrails, gate & lighting in-kind.
-
May 2022
1st fl restroom renovation; new lighting, shower addition, relocate wash/dry, in-kind kitchen, renovation of cabinets, lighting fixtures, appliances, upgrade lighting throughout, paint & new lvt flooring.
-
Nov 2025
Recommencement and completion of work approved under permit application 202010015693.
-
Feb 2026
To comply with nov 202544001; repair dameded front door area & lobby. concrete masion unit wall, electrical, elevator, lobby lighting, mail box repair. tile walkway, repair security system repair, garage storage repair & hvac system.
-
Apr 2026
One unit: remodel existing bathroom in apartment. replace tub to shower, vanity, toilet, tiles. minot electrical and plumbing work to be completed. new water proofing.
DBI holds 42 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 42. 4 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update