90 Bartlett Street
Mission · San Francisco, CA 94110
Permit history
-
Dec 2019
Replacing 116 windows in-kind in 14 one unit visible windows to be replaced with milgard ultra fiberglass and remaining 67 window to be replaced with simonton vinyl windows retrofit.
-
Apr 2018
Upgrade includes: ada 2 smoke detectors, 1 thermal detector, 1 heat detector, 4 replay modules, 2 monitor module to existing special function panel.
-
Dec 2017
Emergency sprinkler monitoring system replacement includes control panel, 1 smoke detector, 1 ten input monitor module, 1 ip/gsm communicator.
-
Jun 2017
Replace 104 windows; 36 visible from street; no structural changes; max u-factor.32 - 36 visible to be fiberglass; 68 non-visible to be vinyl.
-
May 2017
Remove 1 window at street side. replace with in kind replacement within existing openning., one unit.
-
Nov 2016
Replace 61 windows visible from the street - no structural changes - max u-factor 0.32.
-
Sep 2016
Rjeplace 94 windows back and side. max u-factor 0.32 or better. no window is visible from street. no structural changes. vinyle frames. one unit: 15 windows, 302: 11 windows, 601: 11 windows, 602: 13 windows, 603: 5 windows, 604: 6, 605: 3, 606: 4, 1101: 15, 1102: 11 windows.
-
Oct 2015
Units: #801, 802, 1001, 1002: replace 64 windows in kind. 24 windows facing the street will be replaced with fiberglass windows and the remaining rear windows will be replaced with vinyl windows in kind.
-
Dec 2014
Replace 24 windows and 1 patio door inkind 6 visable from the street. white vinyl no structural changes max factor.32. maher na.
-
Jul 2013
Barriel removal, add an addition parking accessible space to be in compliance with the ada requirement.
-
Sep 2009
Reroofing.
-
Oct 1997
Replace two existing drains, slope area with light=weight concre.
-
Dec 1994
Reroofing.
-
Nov 1994
Repair damaged rebar due to leak at west wall of building.
-
Oct 1988
No changes.
-
Jul 1987
Rehabilitate 2nd fl, add supporting columns & footings.
-
Mar 1985
Install fire sprinkl. sysm. in new 2nd level parking garage.
-
Sep 1982
Vertical extension.
-
Aug 1982
New construction wood frame.
-
Aug 1982
New construction wood frame.
-
Aug 1982
New construction wood frame.
-
Aug 1982
New construction wood frame.
-
Aug 1982
New construction wood frame.
-
Aug 1982
New construction wood frame.
-
Aug 1982
New construction wood frame.
-
Aug 1982
New construction wood frame.
-
Aug 1982
New construction wood frame.
-
Aug 1982
New construction wood frame.
-
Aug 1982
New construction wood frame.
8 nominal $1 street-space permits are omitted.
Not yet documented: the architect and builder, the early residents and the date of the last recorded sale. Know any of it? Tell us — just describe it in plain words.