113–115 Bartlett Street
Mission · San Francisco, CA 94110
Permit history
-
Jan 2025
Install (2) ev chargers for assigned parking (level 2), install (2) 50a/240v two pole circuit breakers on existing 125 amp house panel. install concrete wheel stops, bollards, or other ah requried protection for evse.
-
Apr 2017
Revision to permit application 201607132276 - remove exisitng wall at garage.
-
Apr 2017
Provide fire sprinkler monitor system as req'd per permit application 201608235712.
-
Aug 2016
At block 3634, lot 046, add new addresses 115b bartlett st per permit application 201607132276. also changes addresses from 113 1/2, 115 1/2 bartlett st to 113a, 115a bartlett st.
-
Aug 2016
Install nfpa 13r (unit) & nfpa-13 (garage) overhead & underground fire system in ground floor only. ref 2016-0713-2276.
-
Jul 2016
New residence & storage rooms at 1st story. new bathroom at existing laundry room at 3rd story.
-
Jul 2016
Revision to soft story retrofit (permit #201606018811)per 30-15. structural only, perimeter foundation 46' plus slab.structural only.
-
Jun 2016
Soft story retrofit per ab94.
-
Jun 2016
Replace windows and doors at north and east exterior walls. remodel storage rooms at ground floor.
-
May 2016
Replace bathroom fixtures, sheetrock and floor. remove brick chimney in preparation for voluntary seismic upgrade, sheetrock kitchen(remove old plaster).
-
Oct 2015
Structurak shtg to remain. r&r t3 siding due to dry rot. mo more than 500sq ft. work is at rear porch only. not visible from the street.
-
Oct 1998
Reroofing.
-
Jul 1996
Remove rotten rear stairs & replace with new members.
4 nominal $1 street-space permits are omitted.
Not yet documented: the architect and builder and the early residents. Know any of it? Tell us — just describe it in plain words.