1525 Bryant Street
Mission · San Francisco, CA 94103
-
1929
Built as the Continental Baking Company plant, a four-storey industrial bakery in the Renaissance Revival style, concrete with a yellow face-brick veneer. Designed by Bliss and Fairweather.
-
1939
An addition was built.
-
1947
Additions were built to the south and east.
-
1965
An addition was built to the south.
-
Sep 1983
Sign.
-
Jan 1987
Vertical extension, 4' raised roof.
-
Jan 1987
Increase width of existing truck lane access to rear of building.
-
Mar 1987
Revise work in progress per app, n. #8701215.
-
Aug 1988
Horizontal addition.
-
Feb 1989
To comply with warning of violation dated january 20, 1989.
-
Mar 1989
New concrete retaining wall, remove existing wall.
-
Sep 1993
Seismic upgrade of parapet walls.
-
Sep 1993
Construct new concrete retaining wall.
-
Feb 1994
Cut in new openings in concrete wall for loading dock.
-
Mar 2006
Build new customer service office 2900 sq ft. 29 max occ load.
-
Aug 2006
Build new storage. no increase in building square footage. customer service area work was done at 1st floor as per permit application 2006/03/07/6185, fire sprinkler under separate permit.
-
Apr 2007
Demolition existing fire sprinkler system for phase 1. install new fire sprinkler system for phase 1 on basement floor, 1st floor, 2nd floor for new storage units. install new fire pump and connect all existing fire sprinkler systems to new fire pump.complaint #199921179.
-
Aug 2007
Install new exterior loading dock.
-
Jan 2008
Reroofing.
-
Mar 2008
Reroofing.
-
Oct 2008
Demolition existing fire sprinkler system in basement and 1st floor area for system #2 + #3 to room for new storage units. add new fire sprinkler system to meet the requirement of the new storage units.
-
Dec 2008
Basement: install new storage units 1st floor: install new storage units, door, walls. 2nd fl: install new rated walls and door. mep and sprinklers on separate permit.
-
Jun 2009
Covert vacant conference/locker space to an accessory dwelling to unit for building manager. demolition walls, plumbing & electrical. install walls, power/communication, plumbing, hvac & finishes.
-
Jul 2009
Add new toilet, janitors closet, break/locker room & office at column line 1-d.
-
Aug 2010
Install additional storage unit on 2nd floor. light demolition of walls, door & demolition men & women's restroom & construct new men & women's restroom.
-
Nov 2010
T24 drawing for hallway lighting and plugs, level 2.
-
Mar 2011
Phase iii - demolition existing sprinkler system and install new sprinkler system for new storage units on 2nd floor.
-
Aug 2011
Phase 4. demolition existing sprinkler system and install new sprunkler on 1st and 2nd floor for new u-box storage area.
-
Sep 2014
Reroofing, tear off all layers roof taperes eps modified base sheet cool modified cap sheet, no structural changes, class a 41sq less than 2/12. n/a ordinance #155-13.
DBI holds 53 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 53. 3 of them are nominal $1 street-space or sidewalk permits.
The statement's narrative gives 1929 and elsewhere 1928-29; the survey data table gives 1928. Not yet documented: the developer and the early tenants. Submit an update