1550 Bryant Street

Mission · San Francisco, CA 94103

  • Built 1915
  • Office building
  • 10 stories
  • Zoned M1
  • District 9
  • Historic status: unevaluated
37.7676, −122.4111 Street View appears here once a Google Maps embed key is configured.
182,352 sq ftBuilding area
27,088 sq ftLot area
46Rooms · 35 baths
  1. 1915

    Built as the Hamm's Brewery, a nine-storey concrete complex and an early example of concrete construction in the district.

    Showplace Square / Northeast Mission Historic Resource Survey, adopted 2011
  2. 1953

    Built as an industrial building. The survey credits Meyer & Evers with rebuilding the 1915 brewery building in 1953.

    Showplace Square / Northeast Mission Historic Resource Survey, adopted 2011
  3. 1975

    The brewery closed.

    Showplace Square / Northeast Mission Historic Resource Survey, adopted 2011
  4. May 1983

    Additions alterations or repairs.

    Complete Permit 8303880S $$$ $4,800,000
  5. 1984

    Renovated for offices and showrooms, leaving the concrete frame and massing.

    Showplace Square / Northeast Mission Historic Resource Survey, adopted 2011
  6. Feb 1986

    New tenant improvement work - partitions, doors, acoustical.

    Complete Permit 8602145 $$$ $296,580
  7. Jul 1986

    Tenant improvement work - 1st time work in this space.

    Complete Permit 8608889 $$$ $285,000
  8. Oct 2007

    Voluntary seismic improvement to stair and elevator due to loss value of building strength., provide anchorage, metal stud and strong backs.

    Complete Permit 200710115130 $$$ $825,000
  9. Oct 2007

    Voluntary seismic improvement of existing concrete chimney stack and containment of the hollow clay tile. infill wall surrounding the stack. purpose of this permit is to decrease the probable maxi.loss value of building. by improving seismic. strengthening of existing concrete c.s. 10th floor and up.

    Complete Permit 200710115133 $$$ $475,000
  10. Aug 2012

    9th floor-t.i includes building out full height non structural partitions, new doors/frames. interior glazing relocation of light fixtures & selected new lighting. all new or revised/modified hvac, electrical, plumbing & life safety work will be design build & submitted seperatly.

    Complete Permit 201208016228 $$$ $150,000
  11. Feb 2013

    Replace existing fluid cooler and boiler with new high efficiency fluid cooler and boiler. new fluid cooler and boiler shall be in same exact location as existing.

    Complete Permit 201302079746 $$$ $250,000
  12. Feb 2013

    Renovation of building lobby, all elevator lobbies, ada restroom upgrades on all floors, bike room, stair rails, new shower rooms, lift roof deck upgrade, new exterior finishes & paint, elevator cab interior.

    Complete Permit 201302120041 $$$ $1,500,000
  13. Feb 2014

    8th fl new non structural paritions, interior doors, glazing. new or revised hvac, electrical, plumbing, life safety design build, submitted separately. building fully sprinlered. glass partitions under separate permit with structural.

    Complete Permit 201402188702 $$$ $750,000
  14. Feb 2014

    8th floor t.i. includes building new non-structural partitions, new raised floor area & kitchen. (all new or revised hvac, electrical, plumbing & life safety work will be design build & submitted for permit separately). building fully sprinklered, demolition included.

    Complete Permit 201402289570 $$$ $750,000
  15. Apr 2014

    #400 & #490- t.i. includes build out of a few full height non-structural partitions, doors/frames & glazing, all new or revised hvac, electrical, plumbing and life safety, work will be submitted seperately. building is fully sprinklered. n/a to ordinance #155-13.

    Complete Permit 201404173490 $$$ $250,000
  16. Nov 2014

    7th fl - suite 700 and 710. ti includes builing out full heights and low height non structural partitions etc. all new or revised hvac. electrical, plumbing and life safety/sprinklers will be design build and submitted for permit separately. maher not req.

    Complete Permit 201411212199 $$$ $500,000
  17. Mar 2015

    9th floor: ti includes the demolition of nonstructural partitions and build new non structural partitions. all new or revised hvac, electrical, plumb, and life safety work will be submitted seperately. bld is fully sprinkled maher - not req'd.

    Complete Permit 201503191272 $$$ $240,000
  18. Jun 2015

    4th floor suite #450: t.i. includes demolition of non-structural partitions and building new non-structural partitions. all new or revised hvac, electrical, plmg, life safety and sprinklers will be design built and submitted for permit separately, building is fully sprinklered. n/a for maher.

    Complete Permit 201506300268 $$$ $200,000
  19. Oct 2015

    Ste 545 - demolition of non-structural partitions; new non-structural partitions. remodel break area. carpet removal, new carpet installation; mep & life safety/sprinklers under separate permit.

    Complete Permit 201510028704 $$$ $250,000
  20. Oct 2015

    3rd floor: ti demolition non structural partition and building non structural partitions. all new or revised mep and life safety work will be design build and submitted sep.

    Complete Permit 201510159801 $$$ $950,000
  21. Dec 2016

    Suite #555: see demolition permit for stes 555 & 575 (201611142661) demolition of non-structural partitions, new non-structural partitions, remodel break area, carpet removal, new carpet installation, mep, l/s & sprinklers deferred under separate permits; maher n/a. assembly space for dining area.

    Complete Permit 201612144977 $$$ $311,316
  22. Dec 2016

    3rd floor - ti -demolition of non structural partition. new parthion, doors, frame, lighting, cabinetry. mep to be filed seperately. n/a ordinance #155-13.

    Expired Permit 201612205497 $$$ $350,000
  23. Jan 2018

    2nd fl - ti on 2nd floor to include new non load bearing partitions, finishes and millwork. mep & fire life safety under separate permit.

    Complete Permit 201801239238 $$$ $400,000
  24. Feb 2018

    2nd floor-installation of new light fixtures and switching and auto control to comply with t24 reqs. installation of new recpt.tel/data, flore box as indicated on power plan maher na.

    Complete Permit 201802060523 $$$ $426,259
  25. Oct 2020

    1st fl: lobby renovation. new primary entrance to building. upgrade entry ramp, interior walls & floor finishes; fire-treated wood deck platforms for seating; slight modification of existing kitchen equipment layout. new planters. new glass partition at bike storage. mep under separate permit if needed.

    Cancelled Permit 202010317914 $$$ $750,000
  26. Jun 2021

    6th floor: t.i. include demolition of non-structural partitions & building. newnon-structural paritions, all new or reivsed mep, life safety & sprincklers if needed will be deisgn build and submitted separately.

    Complete Permit 202106162596 $$$ $532,000
  27. Aug 2021

    (6/f ti/5th exit corr) ti includes demolition of exterior wall and glazing at new patio; new interior ramp/stair/landing, exterior operable wall system and exterior canopy. all new or revised mep like safety and sprinker if needed will be design build and submitt sep.

    Complete Permit 202108045709 $$$ $1,500,000
  28. Jun 2022

    (2nd fl) ti includes the demolition of non-str paritions and building new non str paritions. all new revised meps and life safety work will be design build and submitted separately (building is fully sprinklered).

    Complete Permit 202206176601 $$$ $398,624

DBI holds 455 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 455. 6 of them are nominal $1 street-space or sidewalk permits.

The statement's narrative dates the surviving building to 1915; the survey data table gives 1953. Not yet documented: the architect and builder and the early tenants. Submit an update