652–658 Capp Street
Mission · San Francisco, CA 94110
Permit history
-
Nov 2020
Upgrade existing fire alarm system to provide notification to new adu and provide sprinkler monitoring to new adu. ref permit application 2019-0212-2722. ref sprinkler # 2020-0831-3043. ref fa # 2019-0605-2583.
-
Aug 2020
Install overhead fire sprinklers system in new adu, install new water service line for new fire sprinkler system from curb to the building.
-
Jun 2020
Scope of work: mechanical revision to approved permit # 201902122722 1. change approved gas tankless water heater to heat pump water heater 2. change approved hydronic fan coil space heater to ductless heat pump 3. change prescriptive title 24 report to performance method.
-
Oct 2019
As built for fire alarm app#201906052583. add a low frequency sounders to a bedroom.
-
Jun 2019
Reroofing.
-
Jun 2019
Upgrade existing fa system and install low frequency sounders in all sleeping areas per sffc section 1103.7.6.1 as built fa # 201905291903 ref 201903054461.
-
May 2019
Upgrade existing fire alarm system and install frequency sounders and smoke detectors in all sleeping areas per sffd section 1103.7.6.1. ref app#201903054461.
-
Mar 2019
Revision to permit application 201903054461. reduce work scope to: paint ext building. replace existing 10 windows existing wood to be replaced for vinyl not facing st. north side only.
-
Mar 2019
62 windows replace in kind; all windows facing street to be aluminum; paint exterior building.
-
Feb 2019
Remodel of an existing rear yard storage to create a new adu with new kitchen, bathroom, living & bedroom areas. new deferred sprinkler system. adu per ordinance 162-16. the bedroom is in the new 2nd story.
-
Sep 2017
Soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4.
-
Apr 2002
Install back stairs handrail top floor per n.o.v200225012.
4 nominal $1 street-space permits are omitted.
Not yet documented: the architect and builder and the early residents. Know any of it? Tell us — just describe it in plain words.