1750 Cesar Chavez Street
Mission · San Francisco, CA 94107
-
1943
Photographed.
-
Dec 1984
Demolition.
-
1985
Current structure built.
-
Feb 1985
New construction.
-
Nov 1985
Tenant improvement to a shell building.
-
Apr 1986
Tenant improvement.
-
Feb 1987
Interior partition with new suspended ceiling.
-
Apr 1987
Install new partitions walls, plumbing.
-
May 1987
Provide new partitions with new suspended ceiling, new toilet.
-
May 1987
New partition walls of a suspended ceiling & a toilet.
-
Mar 1992
Horizontal addition.
-
May 1995
T.i. for dialysis clinic. fire alarm/sprink sparate permit.
-
May 1999
Interior tenant improvement for an expansion of existing use.
-
Aug 1999
Oti-1 el, me, g-floor.
-
Apr 2000
Oti-2 el, me, g-floor.
-
Jan 2005
Enlarge lab space in existing lab/office space/additional outlets minor hvac alteration/shower upgrade.
-
Feb 2005
Remove 924 of concrete, excavite to top of tanks install new 4" raisees & evr upgrades & repour.
-
May 2012
Suite d- tenant improvement-remodel for new commissary kitchen for tout sweet patissere at macy's. upgrade existing restroom to comply with ada. provide kitchen equipment for cooking pastries. existing office area to remain.
-
Mar 2013
Suite e: tennant improvement for commercial kitchen type 1 hood.
-
Aug 2019
Modifing an existing kitchen commissary to a full commercial kitchen.
-
Nov 2023
Demolition only- interior only, non-structural demolition of vacant tenant space for future tenant improvement. disable acces features to be provided once space is re-occupied per ab-017.
-
Mar 2024
Fire only- relocate facp and annunciator panel aes smopke detector and manual pull station install (1) new relay module for existing ac-5 unit.
-
Aug 2024
T.i. to existing 1 story building site 1 existing parking stalls is compliant per ada requirements 2. remove landscape with new a.c. paving at new roll-up door drive way 3. provide new international accessibility sign /symbol exterior 1. new 10x12 roll up door in existing opening to match existing interior.
-
May 2025
Furnish and install 3 new ac, gas/electrical rooftop units for warehouse. this to include curbs, dump-style 4 way supply distribution, economizers and auto shut off smoke detectors.
-
Jun 2025
For suite a; t.i. of existing warehouse suite. scope includes: new non-structural partitions, ceilings, finishes, light fixtures and doors. change of occupancy.
-
Jul 2025
One unit, t.i. of existing warehouse suite. scope include non-structural demolition, new non-structural partitions, ceilings, finishs, light fixtures, and door.
-
Jul 2025
Ste# a: install 3 new duct detectors for hvac, ref to building permit application 202505096150.
DBI holds 78 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 78. The assessor dates the building to 1985, after this photograph was taken.
Nearby
- 1900–2190 Cesar Chavez Street Same street