1900–2190 Cesar Chavez Street
Mission · San Francisco, CA 94124
Permit history
-
Oct 1985
Created during job card update on: 12/08/88.
-
Apr 1986
Install retaining wall in parking area.
-
Apr 1991
Reroofing.
-
Aug 1993
Reroofing.
-
Jul 1995
Non structural ti & h.c. accessibility upgrade.
-
Dec 2000
Add 7 new dry pendent sprinklers to existing walkin in freezers.
-
Nov 2001
Seismic retrofit of unreinforced masonry building.
-
Feb 2009
Replace old panel with new fire panel. new sprinkler monitoring devices. connect existing waterflows and gate valves using existing wire to new panel and monitor per nfpa72 central system.
-
Feb 2009
Replace old panel with new fire control panel. install sprinler monitoring devices, connect existing water flows, gate valves using ex wire to new panel and monitor per nfpa 72 control system monitoring.
-
Jun 2014
2nd floor. t.i to exsiting office space. maher-compliance with ordinance no. 155-13 not required.
-
Oct 2014
Interior remodel including new stair, non structural paritions, ada restroom and shower.cost of construction for mep and sprinkler not included in this permit. n/a for maher ordinance.
-
Dec 2014
T.i. to office areas, add & relocate fire sprinklers on 1st and 2nd floors, t.i. permit application 201406309942. n/a ordinance #155-13.
-
Feb 2015
1)add sign(regarding access) at entry. 2) occupy space as wholesale warehouse. n/a for the maher.
-
Mar 2015
To erect electric single faced wall sign. n/a maher ordinance.
-
Mar 2015
New non electric channel letters on existing canopy. n/a maher ordinance.
-
Dec 2015
Add limited restaurant (to go sandwich bar) to existing warehouse. upgrade restroom to comply w current ada code. mep sep permit.
-
Dec 2018
Brick masonry repair interior pilaster replacement. n/a for maher.
-
Aug 2019
Refoofing.
-
May 2020
Reroofing.
-
Apr 2021
(1) remove damaged/displace brick, expose rebar treat with rust inhibitor @ blind plaster replace brick (2) remove replace split displaced brick. replace to match (3) remove one course of brick expose lintel clean and treat rust with inhibitor. comply with nov.
-
Dec 2021
Legalize s-2 to f-1 change of partial 1/f area for new proposed tenant.
-
Jan 2024
2 stories fully sprinklered. voluntary request to remove existing phonelines and replace with cellular communicator. modify fire alarm system.
-
Jan 2025
Existing fire sprinkler system ti. add 6 pendent fire sprinklers ref# 202112144417.
-
Apr 2025
1. replacement of 2 fire doors (like for like) at 2150 cesar chavez street. 2. replacement of 2 fire doors (like for like) at 1920 cesar chavez street.
DBI holds 33 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 33.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update