1297–1299 Dolores Street
Mission · San Francisco, CA 94110
Permit history
-
Oct 2019
Dry rot repair and stucco- 125, feet.
-
May 2017
Install fire sprinkler system. re-submit as built plans.
-
Apr 2017
Installation of a new sprinkler monitoring system. ref app# 201307111648 and ref for sprinkler app#201608235719.
-
Aug 2016
Installation of new fire sprinkler system per nfpa 13, 76 fire sprinklers, with new 2-inch fire service off of 6 inch main on 26th st.
-
Jul 2013
Interior modifications to existing 3rd floor residential unit and contruction of a new 4th fl addition & roof deck area to create a penthouse unit.
-
Nov 2012
Cut retaining wall and recess it by 54" wide and 40 depth. for garage and recycling cans.
-
Aug 2012
Replace 23 windows (old aluminum) with wood clad windows. rescue windows to remain.
-
Jul 2012
Add a roof deck & fire escape.
-
Mar 2012
1. move a wall & enlarge bathroom area. renovate bathroom. 2. renovate kitchen. open wall to living room 3. dry rot repair only at light well.
-
Jul 2010
Revision to 201006295511. remove non bearing wall at closet. repair sheetrock to accomodate rewire and replumb. remodel e bath existing. add 1 additional full bath in unit, 3rd fl.
-
Jun 2010
Change cabinet in kitchen update appliances.
-
Mar 2009
Replace cabinets & countertop only. new recessed lights by electric.
-
Dec 2001
See attached termite report #01420.
-
Apr 1987
To bring building into code.
-
Aug 1986
Install aluminum windows.
-
Dec 1983
Install iron gate at main entrance.
-
Jul 1982
Building use: dwg.