370 Fair Oaks Street
Mission · San Francisco, CA 94110
Permit history
-
Jun 2024
Remove and replace floor tile on roof deck of garage at front of house. install additional layer on 3/4in plywood glue and screwed to existing plywood which will remain.
-
Mar 2012
Remodel of the master bedroom & master bathroom based on the drawings, dated 12/19/11. all work is on the 2nd floor.
-
Nov 2003
Remove/replace cedar shingles on north & east side of garage/entry.install new deck railing to.
-
Sep 2002
Gta m/b tear off reroofing work.
-
Sep 1999
Remove single-glazed aluminum windows & replace with double.
-
Nov 1998
Remove kitchen wall, install header, open 2 kitchen walls.
-
May 1991
Vertical addition.
-
Jan 1989
Change beam size from 10/54 to 10/26.
-
Dec 1988
Reframe 1st fl entrance door, re #8814898.
-
Sep 1988
Convert kitchen to master bath, 2 unit building to 1.
Not yet documented: the architect and builder and the early residents. Know any of it? Tell us — just describe it in plain words.