1021–1023 Guerrero Street
Mission · San Francisco, CA 94110
Permit history
-
Feb 2008
Scope of works per plans.1) install holdowns. 2) install plywood 1/2 cdx plywood - 1st thru 2nd floor thru 3rd floor and 3rd floor thru roof level.not seismic upgrade.
-
Jan 2008
Relocate stair (revision to application 200707035902). interior remodeling only, no exterior change. change configuration of kitchen & bathrooms on 2nd & 3rd floors. seismic upgrade on building. raise center line 12" @ roof for drainage. revisions of stairway to 3rd floor & roof.
-
Jul 2007
Interior remodeling on 2nd & 3rd floors. relocate kitchen on both floors. add 2nd bath to both floors. reframe stair to comply with codes. raise existing roof rafters/ceiling joist where needed; level existing floor.
-
Jun 2006
Reroofing.
-
Oct 1999
Reroofing.
-
Sep 1992
Earthqk damage-constr kitchen, front door & stair, shower stal.
-
May 1990
Work at st level within existing structure/replace defective.
3 nominal $1 street-space permits are omitted.
Not yet documented: the architect and builder and the early residents. Know any of it? Tell us — just describe it in plain words.