36–42 Hoff Street
Mission · San Francisco, CA 94110
Permit history
-
Jan 2025
Install new prefabricated steel stairs at west elevation.
-
Jan 2025
Revision to permit application 202407317635: add 1 relay module for shunt trip, 1 heat detector inside elevator machine room, and add 1 monitor modules for ac shunt supervision.
-
Dec 2024
Demolition & remove 9e) sprinkler head @ top & bottom of elevator shaft for elevator modernization process - 2 heads plugged.
-
Aug 2024
Rev 202404250801 and ref 202407096026- exterior dry rot repair at south elevation (rear of property ).
-
Aug 2024
Install new facu. combination sd & co detectors with lf sounder base in every bedroom & living room. meet sffc 1103.7.6.1.
-
Jul 2024
Change out existing rusted pipe and fittings and sprinkler heads and replace with new galvanized pipe, painted fittings and sprinker on 2/floor garage.
-
Jul 2024
Revision to pa3 2024-0425-0801 dry rot repair at roof, exterior elevation north & middle elevation. selected stud replacement at north exterior non-bearing wall elvations, new roof guard rail attachment to roof, and misc. wood repairs at roof. all repairs are to be done in kind. privately funded.
-
May 2024
Reroofing.
-
Apr 2024
In kind replacement of windows, sliding doors, and stucco at (3) south elevations of the building. scope includes (34) windows, (8) sliding doors as well as replacement of traffic coating at (4) patios and balconies. 17 windows, 4 sliding doors at south elevation (visible to street) will be aluminum.
-
Jul 2022
Replace windows in kind. two windows are facing the streets. u-factor =0.30.
-
Sep 2019
Structural attachment revision for sign b 201903225978.
-
Mar 2019
Install 1 electric wall single faced sign "16th & hoff".
-
Mar 2019
Install electric projecting double faced wall sign "p".
-
Mar 2018
Electrical works associated with the replacement of parking access & revenue control systems (parcs) equipment for the garage, parcs equipments are not part of this permit application.
-
Sep 2003
Reroofing.
-
Jun 1993
Canvas awning projecting 5'.
-
Jun 1993
Non-electric sign.
-
Jun 1993
Reroofing.
-
Dec 1987
Construct walls and install doors for storage closet.
-
Aug 1985
Fire sprinkler system.
-
Nov 1984
Sprinkler plan submittal.
-
Feb 1984
Add to existing parking structure vertically new housing.
-
Feb 1984
New construction.
1 nominal $1 street-space permit is omitted.
Not yet documented: the architect and builder, the early residents and the date of the last recorded sale. Know any of it? Tell us — just describe it in plain words.