1939–1943 Mission Street
Mission · San Francisco, CA 94103
Permit history
-
Mar 1982
Additions alterations or repairs.
-
Feb 1989
Reroofing.
-
Jan 1990
Remove flooring for installation of waste and water for w.c.
-
Feb 1992
Remove storage area.
-
May 1992
Remodel 6 shower rooms.
-
Jan 1997
Rer.
-
Dec 2002
Upgrade fire sprinkler system.
-
Jun 2005
Comply with nov 200560837 legalize repair work near unit no. 62 &unit no. 7 in shower rm framing due to.
-
Jun 2006
Replace tiles in 3 shower stalls by four units. to comply with some items (incled) on nov# 200560427, 200560761, # 200564810 & # 200667894.
-
Jun 2007
We are replacing existing fire escape doors. notice of violation #200560761 item #21. new doors will be 45 minutes fire assemblies.
-
Jun 2007
Patching holes in the ceiling(drywall) between store and hotel.
-
Jun 2007
Replacing existing garage room. one door at each of two floors garage rooms. replace with equivalent fire rating. (60 min).
-
Jul 2007
Place tile in bathrm, doors on shower tob e replaced, to comply with 200667894, 200669356, 200669812, 200671259, 200683772, 200789531, 200789620, 200793311, 200700561 & 200702547.
-
Dec 2007
Comply with novs: 200723858, 200723592, 200726673. legalize 5 rooms with doors, 8' partitions, dressing room for retail clothing store.
-
Jun 2013
To comply with nov 201391063 & 201393321; g/f shop remodel - remove non-loading bearing walls for 5 small rooms; add 3 shower stalls, add anada restroom with a shower. use from previous retail and tattoo into boxing training.
-
Dec 2013
Install 2 new aluminum windows in back of the building. same opening, same type. u-factor 0.40 max. repair interior stairs from top floor to roof less than 50%. to comply with items #2 and #4. nov #201332531.
-
Jan 2014
Replace two existing tank water heaters with new tankless water heaters. comply with nov #199711005 item #2.
-
Mar 2014
Correction to previously issued and completed permit 201312124081. to document that the installation of two new double-hung wood, or aluminum clad wood windows to abate item 1030 on notice of violation 201342321 and item 2 on notice of violation 201332531.
-
Sep 2016
To comply with complaint #201635341. repair (1) shower, remove existing tile, replace shower pan and drain with new, install new tiles.
-
Aug 2018
Mandatory soft story retrofit per 2016 sfebc, appendix a4.
-
Aug 2018
Mandatory soft story retrofit per 2016 sfebc, appendix a4 and ada upgrade.
-
Dec 2019
Reroofing.
-
Nov 2022
Remove the existing sheetrock. including old electrical piping. fix the plumbing leaks and issues with the violation. run all electrical wires through the studs. install new sheetrock tape e skim new flooring new commercial electrical ultra slim 6in new construction led. no guestroom will be removed.
-
Dec 2023
Repair dry wall in 1st floor lobby. repair drywall in hallways, showers and restrooms on 2nd floor. repair drywall in 8 rooms, common showers, and hallway on 3rd floor. repair plumbing and electrical needed like for like. repair flooring on 1st, 2nd, and 3rd floor.
-
Jan 2024
Remove 22 existing windows and replace with new ones. any stucco damage around window will be fixed with same material. paint as well. u=.30max. windows facing street.
DBI holds 55 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 55. 2 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update