Permit history
-
Jun 1996
Repair fire damage.
-
Jul 2000
Install new awning with tube frame &canvas which attach to the wall by lag screw.
-
Jul 2000
Install: counter, floor covering and paint.
-
Sep 2000
Remodel bathroom, change a shower stall, light fixture, comply with his n.o.v. 200008642.
-
Dec 2001
Remodel existing grd floor restaurant. alter entrry doors & interior ramp. construct two hc accessible.
-
Oct 2002
Install fire sprinkler system into commercial space + res. hotel.
-
Dec 2002
Installationof new fire suppression system to the new cooking hood & duct.
-
Apr 2004
For record purposes only regarding appl#200312152272 issued 12/15/03 "reinstate hotel of 16 rooms &.
-
Jan 2005
Provide dialer unit to monitor sprinkler system per sro residential hotel reqs. dialer connects existing.
-
Apr 2005
As built 200210017912 fire sparinkler as builds addition of 8 heads.
-
Aug 2009
Repair interior staircase, 8 steps. replace new wool and nail for the steps. less than 50%.
-
Nov 2009
Upgrade existing building structurally; structural reinforcing @ first floor ceiling.
-
Jul 2010
Revision to p.a. #200911100892. relocate 2 posts.
-
Sep 2011
To comply with #201117361. remove washer and dryer. install new shower stall.
-
Jan 2016
Exploratory demolition to view electrical & plumbing in four units; 100 sq ft in each unit. compliance with maher ordinance no 155-13 not required.
-
Feb 2016
To comply with nov# 201117361, remodel existing sro rooms, electricla service upgrade ot building, rewire sro rooms, re-plumbing existing sinks in sro rooms, (hot/cold) with copper, remodle existing common bathrooms(4 full 2 (1/2 ) new drywall, flooring, paint, cabinets in sro rooms.
-
Aug 2016
1/f- demolition of interior non bearing walls on ground floor, work is on retail portion of building only, per ab-017, space is vacant. n/a ordinance #155-13.
-
Sep 2016
Remodel of ground floor common areas for tenant use. retail space at bld frontage. change of use.
-
Oct 2016
Voluntary ground floor seismic upgrade in north-south direction (transverse) only. n/a maher ordinance.
-
Dec 2016
Commercial ti for yoga studio. includes 2 new bathrooms, new window at rear, laundry & changing rooms. new windows including 3-panel pocket wood and glass door and casement window. repolace glass only at front elevation.
-
Feb 2017
Install fire sprinkler at ground floor per to 201612225768. connect to existing 4" riser maher na, 36 heads per nfpa 13.
-
Nov 2019
Comply to nov# 201975212: secure permit for gas range installed in kitchen. provide 45 minute door into existing fire rated corridor. work on g/f.
-
Jun 2022
To comply with nov 202290646 provide grab bars.
-
Jun 2022
Comply with nov 201975212. existing yoga studio to become a real estate office. new 60 minute fire door.
DBI holds 49 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 49. 6 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update