2073–2075 Mission Street
Mission · San Francisco, CA 94110
Permit history
-
Sep 1989
Re - roofing.
-
Nov 2004
Barrier removal/new entry of mission st, toilets/new fire escape to be submitted separated per ab019.
-
Feb 2005
Revised app#200411129037. 1st floor only.nc-3 personal service 712.89 ref.790.116 from maushel art&.
-
Feb 2005
Streetspace.
-
Apr 2005
Install ventilation systems for cosmotology school. mep. only.
-
May 2005
Reviside coridor location at levels 2 & 3, revised use of office suits 202 & 302 with in b occupancy.
-
Nov 2013
To obtain final inspection for work approved under permit application 200504018921. all work is complete.
-
Nov 2013
To obtain final inspection for work approved under permit application 200411129037. all work is complete.
-
Nov 2016
Removal of non-bearing walls at 3rd level only. no exterior work under this permit.
-
Jan 2017
Sprinkler water flow & supervisory system. install control panel, smoke detector, pull station & aes radio on ground floor. install monitor modules to tie-in existing water flow & tamper switches. ref pa 2016-110-2495.
-
May 2017
Replace 156 upright sprinklers and 9 pendnent sprinklers due to old sprinklers. upgrade eqrthquake bracing, and branch line restraints. no underground work. deficiency work only - no ti to reference.
-
Sep 2020
Per cua 2019-004451prj tenant build out cannabis retail consumption lounge, mill work, storage, locker, shower rooms, office, existing restroom to be ada compliant, relocate doors at entry, new finishes, lighting.
-
Nov 2020
Refurb/reface existing signage. illuminated projecting double-faced blade sign. "union station".
-
Nov 2020
Remove existing finishes. no structural. ab017.
-
Mar 2021
Add on to existing fire alarm system due to new tenant on ground & mezzanine level. install new notification devices thru-out for complete coverage & tie-in to existing control panel on ground floor # 2017-0104-6470, # 2020-0909-3749.
-
Jun 2021
Relocate 14 pendent heads, add 25 pendents and replace 8 heads for new walls being installed. total 47 heads. replace 70' of 1.5" to 2" pipe. install new 3" and 4" pipes to supply new heads.
-
Oct 2021
As-builts to permit application 202103045881. delete 1 strobe on mezzanine, replace 4 wall mount strobes and 2 horn/strobes with ceiling mount at the same location. install new monitor modules to monitor 3 duct detectors.
-
Nov 2021
Revised mechanical plans to 202009093749.
-
Mar 2022
Intalling (1) projecting sign "union station".
Not yet documented: the architect and builder and the early tenants. Submit an update