255–269 Potrero Avenue
Mission · San Francisco, CA 94103
-
1924
Built as the Forderer Cornice Works.
-
1940
Altered.
-
Jan 1982
Building use: metal finishing.
-
Apr 1992
Siesmic upgrade to facility also handicap street level off.
-
Aug 1999
Change of occupancy frm manufactng to off, revise exiting.
-
Mar 2000
Oti-2 me 2nd floor.
-
Mar 2000
Oti-2 me 1st floor.
-
Mar 2000
Otc alterations permit.
-
Mar 2000
2nd floor electrical disbribution & lighting.
-
Jul 2001
Convert portion of manufactur building to retail/wholesale furniture convert portion of manufactur building.
-
Sep 2001
Reroofing.
-
Dec 2010
Interior t.i. on existing 1st & 2nd floors of 2 story building. existing basement to remain as is with no new construction. no new mechanical equipment, no changes to building envelope. partition changes, finishes & lighting.
-
Oct 2011
Demolition existing restrooms & provide new male & female restroom facilities for furniture space (m), new 1 hour rated separation between furniture sales (m). mechanical & electrical under seperate permits.
-
Oct 2011
Demolition existing restrooms & provide new male & female restroom facilities for furniture storage (s-1), new 1 hour rated separation between furniture sales (m) & furniture sales (s-1) tenants. mechanical & electrical under seperate permits.
-
May 2012
1st floor-tenant improvement for storage facility with partial height partitions & new lights. life safety & sprinkler under seperate permit.
-
Mar 2013
Tenant improvements, partitions, restroom and pantry upgrade, replace existing exterior doors. mechanical permit.
-
Apr 2013
Structural work in association with permit application 201303081775.
-
Jun 2014
1)change of occupancy at lower level only. 2) t.i. at lower and upper level.3)new lighting at upper level.4)install new freight lift. 5)install roof deck at upper level. 6)electrical and mechanical. under seperate permit.n/a for the maher ordinance #155-13. no change on exterior front facade. window alter.
-
Jul 2015
Reroofing.
-
Sep 2015
Ground floor: ti - (partitions, add breakroom, add bathroom, no change to exterior) mep deferred.
-
Nov 2019
Demolition of non-structural wall, new construction of non structural walls, new millwork and replacing light fixture. mep deferred.
-
Jul 2020
Reroofing.
-
Sep 2020
Mep review. deferred submittal from permit application 2019-1118-7584.
-
Sep 2020
Revision to 201911187584. no new demolition no structural modification. replace plumbing fixtures and restroom accessories, replace finishes, new paint new lighting, new partitions at restroom 1001, 1010, 1013 and shower 1011 and 1012. mep deferred.
-
May 2021
Reroofing.
-
Aug 2022
Reroofing.
DBI holds 63 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 63. 5 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update