245 South Van Ness Avenue
Mission · San Francisco, CA 94103
-
1926
Built as the Milton Steur Cleaning & Dying Works, concrete construction.
-
Apr 1984
Demolition.
-
Jun 1984
Remove exist. mtl. 1 story building. provide parking space.
-
Jan 1988
Cut exterior walls for doors & windows, intall plumb & electrical.
-
Jan 1990
Ewo-s.
-
Jul 1990
Install grade beams & new slab on grade.
-
Sep 1995
Maint work requiring replace of weathered wood support.
-
Oct 1996
Reroofing.
-
Sep 1997
Correct violations in complaint #9701364.
-
Jun 2003
Install equip shelter on roof, antennas on existing building, utilities( power & telco).
-
May 2009
Swap like for like antennas 6 toltal.
-
Jan 2011
Install new demising partition, upgrade existing sanitary faucets to be fully accessible(singe accomodation, upgrade tenant primary entrances to ada accessible. (building owner improvements) tennant improvements under seperate permit.
-
May 2011
Erect 3 non-electric wall single faced direct new sign.
-
May 2011
Erect 2 electric wall single faced direct new sign.
-
Jul 2011
Tenant fit out of single floor / first floor space. all interior work incl. ada restrooms and office walls.
-
Sep 2011
Revision to permit application 2011.07.20.0639. shelving permit revisions.
-
Dec 2011
To erect electric wall sign.
-
Aug 2012
Install a small (22 gallon diesel) generator on roof at verizon cell site lease area.
-
Oct 2013
Verizon wireless proposes to remove 2 panel antennas per sector (6 total) & replace with similar antennas (swap of all 12 antennas); add rrh units behind parapet wall near antennas. add 3 raycap devices, ret cable & hybrid cable; move alpha sector to new stealth enclosure.
-
May 2015
On roof: install (6) a2 backpacks on existing rrh units on new pipe mounts. add camouflage and new exclusion area striping. ** maher: compliance with ordinance no# 155-13 not required **.
-
Jun 2016
Verizon: revision to 201505216898, adjust antenna centerline, no change to scope of work; maher n/a.
-
Feb 2018
Verizon - relocate 4 existing panel antennas within a new antenna shelter. install 4 rrus, 6 diplexings. install 3 rrus in shelter. maher na.
-
Apr 2022
Verizon wireless: remove 3 existing rrus. remove 3 existing dc-3315 surge protector. install 6 new antennas, 3 new rrus, 3 new dc surge protectors. remove 3 existing 6x12 hybrid cables. install 3 new 12x24 hybrid cables. relocate 3 existing rrus to antennas. remove 3 existing surge protector. install 3 existing surge protector.
-
Jan 2023
To obtain final inspection for work approved under permit application # 2013-1031-0814. all work is complete.
-
Jun 2025
Perform ordinary maintanance to general advertising sign as specified in attached engineering plans in accordance with planning code section 604.
-
Aug 2025
Add non load barring partition walls.
DBI holds 43 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 43. 3 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update