635–637 South Van Ness Avenue
Mission · San Francisco, CA 94110
Permit history
-
Jun 2023
Unit a: terminate 3ft from fl at roof, gsm. ran venting from range hood.
-
Jul 2021
Upgrade existing fire alarm system to comply with sffc section 1103.7.6.1 & include sprinkler monitoring.
-
Feb 2021
Select interior remodel. remove & replace fixtures in bathrooms and kitchens only. no structural work, no framing alterations. no exterior work. 8 bathrooms and 4 kitchens total in 4 units. no fire sprinklers nor fire alarm modification.
-
Nov 2020
Admin permit to document the legal use & occupancy of the rear building (635 a south van ness ave) as a sfd with 1-story over basement. this determination is based on a review of records including sanborn map, assessors records & dbi site visit. no work on this permit. there is a 3-story res @ front of lot.
-
Sep 2019
Rear building - correct nov 201965341 remove & replace 4 windows (same size); replace rotted/damaged framing at rear wall, replace existing siding @ rear wall with new siding.
-
Jun 2018
G/f: remove kitchen hood. kitchen being removed. no cooking facilty req.
-
Sep 2013
To comply with complaint # 201321211, repair or strenghten rear stairs reapir 5% or less in kind.
-
May 1992
Install 1 pro. chem pcl 2.40 gal wet chem fire sup system.
-
Mar 1992
Install type one hood.
-
Feb 1992
Reroofing.
-
Dec 1989
Reconstruct foundation of rear building strengthen existing framing.
1 nominal $1 street-space permit is omitted.
Not yet documented: the architect and builder and the early residents. Know any of it? Tell us — just describe it in plain words.