84–92 Virgil Street
Mission · San Francisco, CA 94110
Permit history
-
Sep 2015
Voluntary addition of attic draft stopping to subdivide attic spaces between unit. total 8 units of 2 buildings in the lot. 4 units facing to s van ness ave and 4 units facing virgil street.
-
Sep 2015
Voluntary addition of attic draft stopping to subdivide attic spaces between unit. total 8 units of 2 buildings in the lot. 4 units facing to s van ness ave and 4 units facing virgil street.
-
Sep 2015
Voluntary addition of attic draft stopping to subdivide attic spaces between unit. total 8 units of 2 buildings in the lot. 4 units facing to s van ness ave and 4 units facing virgil street.
-
Sep 2015
Voluntary addition of attic draft stopping to subdivide attic spaces between unit. total 8 units of 2 buildings in the lot. 4 units facing to s van ness ave and 4 units facing virgil street.
-
Sep 2015
Voluntary addition of attic draft stopping to subdivide attic spaces between unit. total 8 units of 2 buildings in the lot. 4 units facing to s van ness ave and 4 units facing virgil street.
-
May 2015
Reroofing. main roof: remove existing loose shingles of dirt & debris. install new "inkind" laminated asphalt fiberglass shingles. color to e the same as existing.
-
Jun 2013
Revision to permit application 201305096565: increase construction valuation by $7, 000 per inspector's request. add to scope of work - repair 11 existing windows glazings & operating mechanisms. no change to exterior appearance.
-
May 2013
Kitchen remodel on the ground floor. new paint, redo floor tiles. replace kitchen cabinets.
1 nominal $1 street-space permit is omitted.
Not yet documented: the architect and builder, the early residents and the date of the last recorded sale. Know any of it? Tell us — just describe it in plain words.