82–84 Woodward Street
Mission · San Francisco, CA 94103
Permit history
-
Sep 2025
2/f: kitchen and bath remodel. 3/f: kitchen and bath remodel, switch bed and dining room location. interior only, no exterior work.
-
Jun 2025
New gate and new garage entrance. metal gate to match existing front entry.
-
Jan 2025
1/f: raised garage entry door. 2/f: remodel powder, bath and kitchen. 3/f: new office, dining, bed and bath. remodel powder, bath and kitchen. replace in kind window at rear 2/f and 3/f. new heat pump system.
-
Dec 2023
Existing middle beam strengethening with related footings (1st level). voluntary localized strengthening of 1st / garage level.
-
Jun 2018
Perform the repairs as outlines in nov#201866351, items 3/4/5/6/7/10/11/12. note item 8 by owners licensed painting contractor; less than 50%, like for like.
-
Jun 2018
Perform work as outlines in report 20917, item 5/6/7/8. like for like, less than 50%.
-
Feb 1995
Reroofing.
-
Jan 1990
Install 1 6x6 post & pier uncler gurdes, remortar front stair.
-
Aug 1985
Repair rear wood stair new braceing.
2 nominal $1 street-space permits are omitted.
Not yet documented: the architect and builder and the early residents. Know any of it? Tell us — just describe it in plain words.