655 Hyde Street
Nob Hill · San Francisco, CA 94109
Permit history
-
Jul 1985
Comply with dahi report.
-
May 1987
Parapet.
-
Aug 1994
Replace unit entrance door and repair door jambs on 3 units.
-
Sep 1994
Repair outside stucco, &repair interior plaster.
-
Jul 1995
Parapet bracing.
-
Apr 1999
Finl insp 9413184/9415345/correct fr 16 units to 14 units.
-
Jul 2002
Umb retrofit by bolt plus method.
-
Jul 2003
Umb retrofit - rev. to apprvd bldng. applic. #2002/07/26/2466 - remove steel tube frame and changed.
-
Sep 2003
(umb retrofit ) revise #200207262466: correction for wall at front of first floor.
-
Mar 2007
One unit -kitchen/bath remodel in kind. no structural chagnes. building, plumbing & electrical code upgrades. no window or dooor changes. kitchen: at least of lighting wattage must be fluorescent. bath: fluorescent or controlled by motion sensor.
-
Jun 2007
#1-kitchen/bathroom remodel in kind.no structural changes.building, plumbing & electrical code upgrades.no wall window or door alterations.kitchen: at least 50% of lighting wattage must be fluorescent.bath: fluorescent or motion controlled sensor.exhaust termination 3'min.from pl & building. opening.
-
Jun 2007
#4-kitchen/bath remodel in kind. no structural changes.building, plumbing & electrical code upgrades.no wall window or doors alterations.kitchen: at least 50% of lighting wattage must be fluorescent.bath: fluorescent or motion controlled sensor.exhaust termination 3'min. from pl & building. opening.
-
Aug 2007
One unit- kitchen/bathroom remodel in kind. no structural changes. no window door or wall alterations. kitchen: at least 50% of lighting wattage must be fluorescent. bath: flourescent or motion controlled sensor, exhaust termination 3'min. from property line & building. openings.
-
Sep 2007
Work on one unit. kitchen/bathroom remodel in kind no structural changes. no door window of wall alterations. kitchen: at least 50% of lighting wattage must be fluorescent. bath: fluorescent of motion controlled sensor exhaust termination 3' min from pl & building openings.
-
Oct 2007
One unit. kitchen/bathroom remodel in kind no structural changes. no window door of wall alterations. kitchen at least 50% of lighting wattage must be fluorescent. bath fluorescent or motion controlled sensor. exhaust termination 3' min from pl & building openings.
-
Dec 2007
Work @ one unit only. kitchen & bath remodel. no structural. new cabinets, counter, fluorescent light.
-
Aug 2008
#10 & #12 renew for final inspections renew appln #200712211080 one unit and application #200708283977 one unit.
-
Aug 2008
Renew application #200706154109 for final inspection one unit.
-
Sep 2008
One unit. kitchen + bath remodel no structural cabinets, counter, tile fluorescent light.
-
Feb 2009
Renew permit application 2008/08/12/8942 to obtain final inspection. all work has been completed.
-
Mar 2015
One unit -kitchen and bathroom remodels; electrical upgrade, patch, painting; to comply with cec150.0(k)3 & 5.
-
Oct 2015
One unit: unit improvement, kitchen and bathroom remodels.
-
Nov 2018
Like for like fire alarm system replacement. replacing facp, smoke detectors and a manual pull. existing notification devices will be used as originally installed. this installation is in compliance with u.l. standards.
-
Aug 2021
Upgrade the existing fire alarm system by replacing it with 1 addressible fire alarm unit, 1 addressible manual pull station, 4 addressible smoke detectors and 4 horn strobes. newly add 1 wireless communicator next to facu and 30 new low frequency horns at all residential sleeping area.
5 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Not yet documented: the architect and builder and the early residents. Submit an update