900–908 Post Street
Hotel
-
1907
Built.
-
Jul 1988
Parapet safety program.
-
Nov 1990
Repair and replace water damaged drywall in bathrooms.
-
Mar 1995
Umb seismic hazard reduction-bolts w correc procedure.
-
Feb 1996
Refurnish bathroom next to one room floor & shower room tiles.
-
Nov 2011
Reinstall new baseboard heating unit in two units. re-run independent circuit line. existing building use electric heating. comply with nov 201035791 #17 dated 3/18/2010. electric heat replacdment - cec 149 (b).
-
Jun 2013
Comply with ordinance 029-13 only, installation of grab bars in sro at the following locations-1st fl-3 bathrooms (bath & toilet), 2nd fl-4 bathrooms (bath & toilet) & 3rd fl-4 bathrooms (bath & toilet).
-
Apr 2018
Replace all 54 street-facing windows with marvin wood double-hung windows with ogee lugs at both post and hyde frontages. replace 12 non-visible windows in rear with vinyl. no other work. all in kin window replacement.
-
Apr 2018
Bathroom remodel, replace toilet & sink.
-
Nov 2018
Storefront space at ground floor. limited t.i. includes reconfiguration of accessible bathroom & additional of accessible power door at front entry. no exterior work. maher n/a.
-
Oct 2020
Building permit for remodel in kind for 4th fl six rooms to comply with nov 202052031.
-
Oct 2020
Remodel in-kind rooms (1, 2, 3, 11, 19) as well as 2 common bathrooms on 4th fl and 2 common bathroom on 3rd fl. protected guess rm will not be demolitshed or change of use under this permit.
-
Oct 2020
New bathrooms on 2nd, 3rd & 4th floors. confirm as-built conditions on 4th floor - ref permit application 202010015657 and permit application 202010025733.
-
Nov 2020
3 new bathrooms on 2nd floor & 1 new bathroom on 3rd floor (barhrooms added to three guess rooms on 2nd fl; and one guess room on 3rd fl). 1 remodel of common bathroom on 2nd & 3rd floors. per sfbc da-0.1 add grab bar & phane jacks.
-
Nov 2020
To comply with nov# 202052031. 4th fl remodel bathrooms in two rooms, addition of new bathrooms in four rooms. remodel of 2 bathrooms on 4th fl.
-
Nov 2021
New bathroom for one room 2nd fl. no kitchen.
-
Aug 2023
Remodel in-kind common bathroom 2/f, new bathroom added in one room-2/f, new bathroom added in one room-3/f. no residential unit will be connected or demolished.
-
Nov 2023
New bathroom in 25 at 4th fl. no kitchen to be added.
-
Dec 2023
New bathroom in one sleeping room on 3rd floor. no kitchen to be added.cccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccc.
-
Jul 2024
One unit: new bathroom in one sleeping room. no kitchen to be added.
-
Nov 2025
2/fl- managers unit bathroom to be split in (2) to create a new bathroom for one unit. 3/fl- new bathroom for one room and grab bars voluntary added to common bathroom.
DBI holds 27 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 27. 1 of them are nominal $1 street-space or sidewalk permits. 4 expired permits are not shown.
Nearby
- 881–895 Post Street Same street
- 919–925 Post Street Same street
- 717 Hyde Street Same block
- 922 Post Street Same block
- 729 Hyde Street Same block
- 940 Post Street Same block
- 655 Hyde Street Around the corner
- 3 Meacham Place Around the corner