950–990 Mason Street
Nob Hill · San Francisco, CA 94108
-
Nov 1981
Additions alterations or repairs.
-
Feb 1984
Repair hotel cornice at roof.
-
May 1984
Install wall & partitions as per plans for health club.
-
Jul 1987
Install new bar & fixtures, permit for carpentry work only.
-
1989
The Fairmont Hotel, where Art Against AIDS was launched in 1989 with a press conference luncheon.
-
Jun 1989
Exterior veneer to be insalled at floor line spandrels.
-
Feb 1995
Renovation of guest bathrms for ada fl 2 thru 6(2 rms per fl.
-
Dec 1995
Life safety retrofit.
-
Jul 1998
Additions alterations or repairs.
-
Dec 1998
Remodel guestrms, provide disabled access.
-
Mar 1999
Main lobby renovation; remodel existinghistoric 1st floor.
-
Apr 2000
1/f extrior facade renovation and 1/f rear renovation.
-
Apr 2000
Interior non-structural demolition.
-
May 2000
Remodel guest roomsin tower building.
-
Sep 2000
Remodel existing crown room.
-
Nov 2005
Extend existingfire sprinkler system to protect building throughout. work on terrace level, basement, garage 1-3, mezz., lobby, arcade, kitchen, ballroom.
-
Oct 2006
Mezz. - interior finish remodel of existing mtg rooms. demolish 1 wall. add new wall. renovate wash rooms on this level. interior finishes wall covering/carpet/paint. mechanical & electrical & sprinklers separate permits. no structural work. no change to guest rooms.
-
Jul 2007
Application for site permit for planning department approval of floor plan. street elevation, signage and awnings for a coffee shop.
-
Aug 2009
Renovation of kitchen equipment, minor changes to non struc. partitions, replacement of certain light fixtures, new bar and service counters.
-
Mar 2013
Renovation of club one on terrace level sprinkler and fire alarm on seperate permit. no structural work.
-
Nov 2015
Level m: new 14 guestrooms within an existing hotel work to include new partitions mechanical, electrical, new fixtures, finishes and equipment. no exterior work, fire alarm and sprinkler under separate permit; maher n/a.
-
Nov 2015
Arcade level (one floor below main lobby level) tenant improvement to convert a vacant dining room in an existing hotel to office use. work includes new ceiling, walls, finishes. lighting to be re-used & new. proposed to use same existing mechanical ducting n/a maher ordinance.
-
Dec 2016
Active sports club vrf hvac improvements, remove and replace equipment & duct work in mechanical. area.install new outdoor heat pump. disconnect and reconnect nw equipment in mechanical area. providie air balance & install nw fan coils & e.f. maher not req.
-
Oct 2022
Replacing (1) existing hvac chiller with (1) new chiller on roof. new chiller is lighter than existing. we will be rigging chiller in with a crane on sacramento street near corner or mason).
-
Jul 2023
Interior existing 50 hp 208v 3 ph fire pump in basement direct to existing emergency generator from main building roof. replace existing fire pump controller with new fire pump controller with ats. install new breaker in existing emergency generator & fire pump conduits protected by 2 hr rated vitalink cable to new fire.
-
Nov 2023
T.i. cua convert vacant cafe space to car rental retail space. powell entrance replaced in-kind with auto openers, 10 existing garage stalls: 1 existing car wash station to be used by sixt.
DBI holds 199 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 199. 15 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update