999 California Street
Financial District · San Francisco, CA 94108
-
1940s
The Top of the Mark at the Mark Hopkins Hotel, especially busy during the Second World War.
-
Jun 1982
Building use: hotel.
-
Aug 1983
Demolition work non-structural-remove miscellaneous.
-
May 1986
Remodel guest rooms.
-
Feb 1988
Remodel guestrooms suites on the 18th floor.
-
Mar 1990
Exterior earthquake damage repair.
-
Oct 1994
Handicap access upgrade-2 lobby bathrms, 12 guestrooms.
-
Oct 1995
19th floor-renovate & tlt facs at mezz.
-
Sep 1998
Replacement of windows/new windows to match existing elevator.
-
Jun 1999
One-stop, remodel guestrm, corridors, incl non-bearing walls.
-
Jul 1999
Complete life safety system.
-
Jul 1999
One-stop remodel rooms mezzanine level, mechanical and sprinklers.
-
Aug 1999
Fire sprinkler t.i. floors.#2 thru #18 and floor#20.
-
Feb 2000
One-stop, revision guestroom layouts, arch, mep system chagnes, #9912495.
-
Jun 2000
Street space use.
-
Aug 2000
New emergency generator.
-
Nov 2000
Street space.
-
Jun 2001
Renovate arcade level, restaurant, kitchen alteration 16th floor roof.
-
May 2002
Stair enclosure on stairs, voluntary upgrade, enclose stairs, 1, 2, 3 & 4.
-
Jun 2002
Exterior facade upgrade.
-
Aug 2002
6 lvl-fire sprinkler improvements: b3 parking/annex level, b2parking/office, b1 food service, grnd lob.
-
Aug 2002
Renew 9915910 for automatic sprinkler for final inspection only.
-
May 2004
Relocation of fan coils and exhaust fans from stairs 1 and 4 to comply within bid nov #200118542.
-
Feb 2015
Replace guestroom entry doors & service doors on 2 to 18th floors. modify one bathroom on room 1434. n/a maher ordinance.
-
May 2018
8th thru 12th floors - existing guestroom upgrades to refreshing wall coverings, etc. 4 new room per fllor. hallway lighting all new rooms. meps included.
-
Mar 2022
Reroofing: less than 50% tear off existing, system down to deck. install 1.5 iso secured with low rise foam adhesive. 1/2" board with low rise foam 60 mil tpo adhere to prepared surface. color white, sq ft 6559.
DBI holds 127 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 127. 4 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update