The Stanford Court Hotel, a men-only residential hotel with community showers, recorded in a 1954 journal at fifty dollars a month; the building is partially extant.
-
Nov 1982
Building use: hotel.
-
Sep 1989
Reroofing.
-
Jan 1990
Add fire sprinkelr system.
-
Mar 1990
Remodel restaurant and main level into meeting rooms.
-
Apr 1990
Fire alarm system and voice ecavuation upgrade.
-
Jul 1990
Lobby renoliation-relocation desk.
-
Oct 1990
Administration office renovation enlarge/restructure office.
-
May 1991
Add architectural woodwork, paint to existing corridor fl.
-
Jun 1991
Install new entry doors, glass & planter boxes.
-
Sep 1994
Convewrt 2 guestrms to health club, add exiting dis to mtgs.
-
Oct 1997
Revise existingguest rms to provide code reqd, remodel 12 rms.
-
Apr 2002
Rrevise exist. guestroom (ada).
-
Apr 2004
Install propane lpg system as backup source for existing natural gas fired emergencey power generato.
-
Nov 2007
Interior remodel to provde new interior finishes and furnishings for all guest rooms, replace hvac in guest rooms-under sep. application, construct new elevator lobbies on floors 2-8, new ceilings, lighting and wall finishes in public corridors. fire alarm, sprinkler, mep under sep. application.
-
Dec 2007
Renovation of main level food service and dining areas upgrade bathrooms to full compliance. fire alarm & sprinkler under seperate permit. reduction in scope of work from orginal application.
-
Feb 2008
Reference 200711208651 refurbishment of interior finishes and furnishing of all guest rooms. mep only. fire sprinlkers and life safety separage permit.
-
Apr 2008
Lower level-construct new business center and locker room/bathroom. refinish ballrooms and replace ceiling in pre-function area. mep, sprinkler and fire alarm under seperate permit.
-
Apr 2008
Mechanical, electrical and plumbing work on lower level for architectural application # 200804180094. fire alarm under separate permit.
-
May 2008
Fire alarm replacement of existing fa control panel, replacment of speaker/strobes on all floors. replace fire dept phone jacks (telephone) provide new intelligent control points (icp) all ada rooms.
-
Sep 2008
Demolition existing retail shop, a/v office & storage room. 1)construct new retail at existing a/v office. 2)construct new meeting room at existing retail shop.
-
Dec 2012
Remove and replace one 300 ton water cooled chiller. replacement is like for like. new refrigenant leak detector and detector controller. provide new exhaust fan to be run continously and controlled by new detector controller.
-
Oct 2015
Reroofing.
-
Dec 2016
Renovation of public areas of existing hotel. interior work @ existing lobby, dining & bar includes demolition, new partitions, casework, wall, ceiling & floor finishes. electrical, plumb work per plans. existing hvac system to reamin. existing diffusers may be relocated as required by work. exterior work include new glazed entry.
-
Dec 2016
Conversion of existing fitness on 1st floor level to 4 new guestrooms, conversion of existing business center & guest lounge on 6th floor level to 3 new guest rooms, 1 of which is proposed to be fully accessible modification to other accessible room as levels 1-8 to meet current accessible code req'd. interior.
-
Apr 2024
Basement lvl: demolition e) centrifugal fan & install new supply fan.
DBI holds 87 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 87. 5 of them are nominal $1 street-space or sidewalk permits.