800 Powell Street
Nob Hill · San Francisco, CA 94108
Permit history
-
Jun 1982
Building use: apt.
-
Jul 1987
Non structural demolition of bsment, (partitions, carpeting, etc).
-
Aug 1987
Tenant improvement fire sprinklers at kitchen area 3rd floor.
-
Sep 1987
Kitchen remodel.
-
Sep 1987
New concrete floor and structural steel columns.
-
Oct 1987
Interior tenant improvement 1st story, re #8714083.
-
Oct 1987
Remodel kitchen, re #8714081, non structural wall framing.
-
Dec 1987
Fire sprklr system at bsmnt improvements area.
-
Feb 1988
Kitchen remodel, re #8714081, 8714451, fireproof structure.
-
Nov 1988
To install sprinkler system.
-
Jun 1996
Interior demolition only, removal of non-bearing partitions, grd fl.
-
Jun 1996
Renovate existing offices. convert guest rm to women's bathroom.
-
Aug 1998
Relocate fdc to the street.
-
Feb 2009
Upgrade fire suppression system only.
-
Jun 2012
New att(6) outdoor panel antennas to be mounted on existing roof. (5) att equipment cabinets to be mounted in existing storage room in basement (249 sq ft)antenna coaxial transmission lines from rrh to antennas. power and telephone service to be provided from existing sources.
-
Jan 2013
Revision to 201206082226. relocate hvac condensor to roof.
-
Dec 2013
Modification to an existing at&t facility consisting of removing and replacing 2 rrus on roof near existing antennas, also add 2 new innerducts for fiber & dc power within an existing cable tray on roof.
-
Jul 2016
Modification to an existingat&t facility including: r/r 4 antennas (like for like)swap, r/r 4 rru's with newer models of similar size, other minor upgrades in equipment room.
-
Mar 2018
At&t - r&r 4 antennas with 4 new antennas, install other small equip. remove all unused equip. install striping & barricades per emf report.
-
Aug 2020
At&t proposes to: - remove and replace (2) antennas- remove (4) rru's and install (4) rru's@ shelter: - install (1) new 6630 baseband, install (1) xmu in e fif rack.
-
Oct 2022
Reroofing.
-
Nov 2022
Dish: install (3) new antennas, (3) new frp screens, (6) new rru's (1) new equipment platform, (2) new batteries, new electrical panel.
-
Jan 2023
At&t modifications of an unmanned telecom facility consisting of remove & replace (4)existing antennas; remove & replace (6)existing frp vents/chimneys; remove (2)existing rru's; remove (2) existing duw from existing racks; install (1) rectifier + (1) 6648 baseband in existinf dcpp + racks, new rf stripping + sign.
-
Sep 2025
At&t modification of an existing wireless facility consisting: relocate 2 antennas and add 2 air antennas within existing faux chimneys; remove 4 and install rrs (2); r/r 1 power plant; remove 7 rectificers, 6 50 am dc breakers; 4 25-30 amp, 3 15/20 amp dc breakers, 1 battery pack, 1 rack, install 1.
2 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Not yet documented: the architect and builder and the early tenants. Submit an update