226–230 Powell Street
Nob Hill · San Francisco, CA 94102
Permit history
-
Feb 1986
Replace kitchen cabinets & windows, ceiling. appln. #8507321.
-
May 1990
Reroofing.
-
Jun 1990
Reroofing.
-
Oct 1991
Remove exist. alum. storefront, patch exist. cement plaster.
-
Jan 1997
Remvoe all interior finishes to studs so structural engineer.
-
May 1997
Seismic upgrade & renovations.
-
Jul 1997
Install new fire sprinkler system on 4 floors.
-
Feb 1998
Add canapy to existing stor front issued per app#9708091.
-
Feb 1998
Erect an electrical sign.
-
Mar 1998
Install shelf cashier counter display change rooms finishes.
-
Apr 1998
Reconstruction of existing sidewalk over existing basement.
-
Jun 1998
Addt'l. submittal required by 9805159 for mechanical.
-
Jul 1998
Revision to 9708091; revised structural drawing.
-
Oct 1998
One-stop, install non-str stud walls, height casework, lighting.
-
Dec 2004
Install canopy per plan. signages under separate permit. facade under separate permit.
-
Dec 2004
T/i will involve demolition of existing interior partitions & portion of ceiling.
-
Dec 2004
Remove existing storefront. provide new storefront with new finishes and double door.
-
Sep 2005
Proposed a new bealty salon at 3rd fl.
-
Jun 2013
T.i of existing retail space including ceiling, doors, partitions, fixtures, shelving in non sales area.
-
Jul 2014
2 & 3/f - t.i. to existing salon- 1/ replace equipment & fixtures 2/ frame new doors and non-bearing walls 3/new accessible counters 4/ new showers & accessibility & steam room 5/ health dept change of ownership and added use for health care and medical services for ca state certified establishment.
-
Oct 2018
Remove awning, repair cement tile on lower portion of facade, in kind, repaint wood trim and wood details.
-
Apr 2019
Structural repairs @ existing brick & existing steel. no change in use. ti under sep permit.
-
Jul 2019
Revision to app#201904057261 expanded repairs after exposure of steel frame.
-
Oct 2021
Floor 2: infill open floor area cut out under permit#9708091/#9813534. tenant improvement under future permit.ada upgrades to bathroom, kitchen, elevator.floor 3: demolition conference room/office t.i.ada upgrades to bath.
-
Dec 2021
Paint facade, remove canopy over fl 1 storefront, replace stone tile at fl 1 facade.
DBI holds 53 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 53. 8 of them are nominal $1 street-space or sidewalk permits.