236–242 Powell Street
Hotel
-
1908
Built.
-
October 1971
The Stratford, a 105-unit residential hotel in standard condition, recorded ten vacancies.
-
1984
Known as the Hotel Stratford; it was among the rated buildings of the city's Downtown Plan inventory.
-
Feb 1986
Comply with property conservation div.
-
Aug 2002
Street space permit.
-
Aug 2002
Demolition existing finishes including removal of gyb. board, ceiling/floor tiles, storefront & ltgs.
-
Aug 2002
Resurface existing facade with plaster. install new wood storefront window system, install wood floor.
-
Feb 2012
Interior tenant improvement at ground and basement retail spaces only. no change in use. exterior facade and signage under separate permit.
-
Jul 2012
Interior improvemenmt for new journeys store-reuse 3 existing 5 ton split hvac heat pump, install new duct work, new air distribution, new thermostats, perform certified air balance. t.i permit application 2012-0222-4638.
-
Mar 2013
T.i for existing retail store on ground floor. work includes new millwork, fixtures, finishes, electrical, plumbing. no exterior work. no mechanical work. fire protection under seperate permit.
-
Nov 2018
Disabled access upgrade and combine guest toom #211 & #214 interior remodel at four rooms. includingnew shower pan & surround, replacement of plm fixture and cosmetic work. sprinklers & gire alarm under sep permit.
-
Jan 2019
1/f: tenant improvement: minor demolition including ceiling, light fixtures, conduit and unised plumbing. new ceiling, lighting, cutwork, finishes.
-
Jan 2019
Expose original brickwork under existing front stucco; removing existing stucco finish on storefront; replace existing security gate. maher n/a.
-
Jun 2019
Remodel of existing hotel guest room except four rooms provide number of rooms with mobility & communication features. provide new meeting rooms on 2nd floor. add magnetic hold open device @ stair 2; floors 2-8. new reception counter ground floor lobby.
-
Jul 2019
Mechanical and electrical work for arch. permit #201906102979. work includes new vrv system at roof, new fan coils in typical rooms, new refrigerant piping, and new bathroom exhaust fans, and associated electrical work.
-
Sep 2019
Hotel lobby alterations - new counter, new bench seating, new furred wall & partial ht wall, new door new lighting & power.
-
Nov 2019
Renovation of existing grnd fl facade. project includes new ground fl, steel & glass storefront, ground fl facade material, new marquee with recessed down lights & backlit signage; preservation of the existing historic lintel & belt cornice; alteration of fire escape; relocation of fdc under separate permit.
-
Feb 2021
Fire sprinkler tenant im[provement work on the ground floor lobby area & partial on 2nd floor. provide srinkler head location only on upper floors per inspector's request.
-
Apr 2021
Install new fa system with voice evacuation. 1 facu, 2 rps, 0 nac modules, 1 evac system, 95 lfsb, 68 sd, 3 heat, 28 monitor modules, 4 relays, 47 speaker strobes, 91 speakers, 13 strobes, 11 speaker strobes.
-
Apr 2021
Install new errcs.
-
Nov 2021
Interior evacuation signs for floor 2-8.14 common area evactuation plaques, 95 in room evacuation plaques.
-
Apr 2024
Ground floor cafe. no food preparation in kitchen. open non bearing wall to adjacent existing hotel lobby.
DBI holds 79 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 79. 6 of them are nominal $1 street-space or sidewalk permits. 6 expired or cancelled permits are not shown.
Nearby
- 235–245 Powell Street Same street
- 301–345 Powell Street Same street
- 226–230 Powell Street Same block
- 222 Powell Street Same block
- 285–295 Geary Street Same block
- 180–190 O'Farrell Street Same block
- 301–323 Geary Street Around the corner
- 333–337 Geary Street Around the corner