301–345 Powell Street
Nob Hill · San Francisco, CA 94102
-
1950s
The St. Francis Hotel, whose Orchid Room and Oak Room were among the bars sustaining Union Square's long use as a gathering area.
-
Dec 1981
Additions alterations or repairs.
-
Jun 1982
Additions alterations or repairs.
-
Nov 1991
Exterior facade, cornice and sidwalk restoration of original.
-
Dec 1994
Revise/install fire sprinklers work to be done on basement.
-
Apr 1995
Add diesel emergency generator.
-
Apr 1995
Replacement of existing fire alarm system.
-
Apr 1996
Interior impvmnts requiring demolition of existingrestaurant finishes.
-
Feb 1998
Rehabilitateexistingcommon brick ext walls west elevat/light cts.
-
Mar 1998
Interior remodel of existing nightclub to create new dng rm.
-
Apr 1999
Build new fitness center basement level of hotel.
-
Feb 2001
Guest room and bathroom renovation.
-
Dec 2002
Cosmetic remodel of 131 guestrooms in hotel tower, floor 11, 12, 14, 15, , 16, 17, .remodel ( cosmetic) of.
-
Nov 2003
Cosmetic remodel of 88 guestrms and 84 gustrms bathrms on hotel tower floors 7, 8, 9 and 10(4 floors).
-
Mar 2004
Remodel existing restaurant/bar & commercial kitchen, associated work new stone floor in adj, lobby, open.
-
Sep 2008
Remodel 6 suites-31st floor (tower) except for some major work in existing h.c accessible guestroom bath (3180), other work is cosmetic in nature, new wall coverings, paint, carpet, light fixtures, stone finishes, counters in bathrooms, etc. no alteration to hvac or hot water systems, fire, life safety sep.
-
Mar 2015
Structural demolition & core & shell work only. new stairs from basement to 1st floor. new elevator from basement to 2nd floor. new "ground" stairs from 1st floor to 2nd floor. t.i. on separate permit. ** maher: compliance with ordinance no# 155-13 not required **.
-
Apr 2015
Interior t.i. for new victoria secret retail work in westin st francis on union square. work includes new floors, walls, ceiling, millwork, finishes, mep & structural int fitout work. structural core & shell filed separately. n/a for maher ordinance.
-
Aug 2017
Demolition of existing admin offices & stair. demolition of existing lightwell wall & existing infill roofto expand existing lightwell. new guestrooms & storage in former admin space. new finishes to match existing. install new lighting & plumbing fixtures. new roof structure @ lightwell & new window. new mechanical unit on roof.
-
Sep 2017
Remodel main corridors & guestroom baths. corridor: new portals, chandeliers, signage & wall sconces. guest baths: replace plumbing fixtures in 600 rooms. move walls/fixtures in 102 rooms. no changes to occupancy/hvac/fire life 0n/a maher.
-
Jul 2022
G/f: interior remodel of existing retail shop. interior walls, fixture and finishes to be demolished. new interior non load bearing walls to be installed. new doors and ceiling. new lighting and new fixtures and finishes to be installed.
-
Nov 2022
Reroofing.
-
Dec 2022
Minor permit to alter application requst to convert 2 roof decks on the 2/f east side of the building facing union square to occupied decks for social events. access will be through existing windows that will be changed to doors. the adjacent meeting rooms will be reconfigured.
-
Jun 2023
Replace 3 outdoor air handler units including new connecting ductwork in-kind.
-
Jun 2024
1/f: new interior partitions and ceilings. replacement of existing stair with existing door opening. repair of existing accessible lift in place. updated finishes and lighting. new electrical fixtures, outlets and updated electrical panel. new mechanical units and updated duct/diffusers.
DBI holds 382 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 382. 14 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update