414–430 Mason Street
Tenderloin · San Francisco, CA 94102
-
1911
Hildebrand, later of Fabre & Hildebrand, was associated with Righetti & Headman in the design.
-
1911
Eight storeys, beautifully detailed, and notable for its top-story arcade — the most prestigious commission of Paul Righetti's career.
-
Jan 1982
Otc alterations permit.
-
Jun 1985
Construction of temporary field offices.
-
Aug 1985
Addition of 49 seats by reducing size of existing.
-
Sep 1985
Remodel office suite.
-
Nov 1985
Remodel public rest rooms for movie theater.
-
Feb 1986
Office remodel.
-
Jan 1990
Dressing room alterations.
-
Mar 1990
Install hangers to support lighting grid.
-
Aug 1990
Install prefabricated aluminum frame platform.
-
Dec 1998
Demolish existingstage door theater new night club full kitchen.
-
Aug 1999
Install fire alarm-basement, 1st and 2nd floors only.
-
Aug 1999
Install sprinkler system & add fire pump.
-
Jan 2005
Demolition non structural wall, flooring, tile, plumbing, fixture, bar exist duct and chase. non structura.
-
Feb 2005
Interior t.i. -bar, restrooms, electrical, plumbing, framing, paint, drywall, tile, ceiling tile.
-
Jan 2006
Fire sprinkler improvements for t.i. in basement. slide night club.
-
May 2006
Upgrading existing fire alarm system and all devices-all floors.
-
Aug 2006
Slide installation - custom built aluminum slide to fit in night club all astm standards have been met or exceeded see ref materials designed and built by certified playground inspector entrance to sldie to be gated and supervised during working hours.
-
Apr 2008
Reroofing.
-
Jun 2017
Demolition of interior non-structural walls, floor section for accessible entrance, lobby finishes, existing service bars, existing bathroom fixtures, finishes & existing entry slide in preparation of new interior alterations. no exterior work. work to be performed on 1st/ground fl, 2nd fl, and basement. maher na.
-
Aug 2017
Demolition int. non-struct. walls, lobby floor section for accessible entrance, lobby finishes, existing service bars, existing bathrm fixtures, finishes & existing entry slide in preparation of new interior alteration. new basement work includes new lounge and restaurant seating, new bowling lanes, & int. finishes.
-
Nov 2017
To erect electric, single faced sign. sign a per plans (2) individual letter sets mounted on marquee reader board. ** maher: n/a **.
-
Dec 2017
Due to interior remodel in basement, 1st, 2nd fl club area increasing occpancy load, new voice evac panel installed near e fire control panel 1st fl for voice evac system. ex notification appliances replaced w speaker strobes, new is install and tie into e panel.200605121520 & 2017-0830-6464.
-
Oct 2020
Replace smallflue cooler like for like. weights and measures are the same as existing. maher n/a.
-
Apr 2025
Demolition only, no ti. ab017.
-
Nov 2025
Demolition unpermitted storage room with loft at 4/f ste #402, new non-combustible storage room with storage loft at same size & location as existing.
DBI holds 74 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 74. 13 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer, the early tenants and the date of the last recorded sale. Submit an update