655 Stockton Street
33-unit apartment building
-
1915
Built.
-
1976
Rated '1' in the Department of City Planning's 1976 architectural survey.
-
Jan 1983
Install new kitchen cabinets & counters.
-
Oct 1995
Reroofing.
-
Jul 2011
Remodel kitchen and bath three units. repair dry rot damage and lighting to comply with cec 150 k. no change to windows, walls, and doors. no change to exhaust system.
-
Aug 2011
#108, #208 - remodel kitchen and bath. lighting to comply with cec150(k). no change to windows, walls & doors. no change to exhaust system. bath area is approx 5'x7'. kitchen is approx 6'x9'.
-
Aug 2011
One unit: bathroom / kitchen remodel one unit.
-
Nov 2011
Remodel kitchen and bath, lighting to comply with cec 150(k); no change to exhaust system, no change to windows, doors, walls, work in one unit only.
-
Jun 2012
One unit- remodel kitchen and bath, lighting to comply with cec150(k), no change to window, walls and doors.
-
Jun 2013
One unit: remodel unit, add laundry outlet, remove non bearing walls, relocating of kitchen fixtures and cabinets, remodeling of bathrm including new tiles, toilet & vanity.
-
Jun 2013
One unit remodel, add laundry outlet, remodel non-bearing partition walls, add on new closet, remodel of bathroom including new tiles, toilet and vanity.
-
Oct 2014
Remodel one unit: add laundry outlet, remove non-bearing wall, add new closet, remodel kitchen & remodel bathroom in kind; maher n/a.
-
Jul 2016
Supplemental steel framing to support floor slab and stair.
-
Jul 2016
Remodel one unit, 3rd floor - remodel existing bathroom, remodel existing kitchen, add washer and dryer. n/a ordinance #155-13.
-
Aug 2016
Soft story seismic retrofit per sfbc chapter 34b. new pw shear walls w crawl space & new moment frame.per 2012 iebc appendix a-4. n/a for maher ordinance no. 155-13.
-
Sep 2016
Remodel one unit at the third floor. remodel existing bathroom, remodel existing kitchen and add washer and dryerl. n/a for maher.
-
Nov 2016
One unit, 4th floor - remodel existing kitchen, remodel existing bathroom, add 2nd closet, add washer & dryer. n/a maher ordinance.
-
Dec 2016
Soft story retrofit of mulit unit aparment bld per sfbc soft story ord chapt 34b iebc 2012 maher na.
-
Oct 2019
Upgrade e fire alarm to comply with sffc 1103.7.6.1 and nfpa 72.
-
Mar 2021
One unit: convert existing kitchen to bedroom. relocate kitchen. rehabilitate existing bathroom. install washer & dryer.
-
Jun 2021
#112: remodel existing kitchen. remodel existing bathroom.
-
Nov 2021
One unit: rehabilitate existing bathroom & kitchen. install washer & dryer.
-
Mar 2022
One unit: rehab existing kitchen, existing bahtroom, install washer/dryer.
-
Nov 2023
To comply with complaint # 202312321: one unit: bathroom remodel. kitchen remodel. no moving walls. no exterior work.
-
Oct 2024
One unit: new kitchen and bathroom remodeling. new washer and dryer. new dishwasher.
-
Nov 2025
One unit: bathroom remodel like for like.
-
Feb 2026
One unit; remodel existing 1 kitchen, remodel existing bathroom, install washer/dryer.
DBI holds 43 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 43. 3 of them are nominal $1 street-space or sidewalk permits.
Nearby
- 645 Stockton Street Same street
- 800–810 Stockton Street Same street
- 845 California Street Same block
- 621 Stockton Street Same block
- 34 Joice Street Same block
- 16–18 Joice Street Same block
- 840 California Street Around the corner
- 790 California Street Around the corner