550–560 Sutter Street
Nob Hill · San Francisco, CA 94102
Permit history
-
Jan 1984
Contractor will perform demovition for future tenant improve.
-
Jan 1984
New drywall stud patitions paint electrical alteration.
-
Mar 1984
Install new roof.
-
Mar 1984
Structual steel head out foor stairway.
-
Aug 1990
Awning.
-
Sep 1991
Suspended ceiling framing with flourescent light fixtures.
-
Nov 1994
Reroofing.
-
Jan 1997
Seismic upgrade per plans.
-
Jun 1997
Additional floor anchors for 4th floor re: permit application 9700207/r3.
-
Jun 1997
Reroofing.
-
Dec 1997
Demolition stairs instal new stair/bath/replace front door/corridr.
-
Feb 1998
Erect sign.
-
May 1999
Interior remodeling new lighting new shelfing.
-
Aug 1999
Repair of exist brick wall-refer to-9909731 for access compl.
-
Mar 2000
Removal of non bearing partition walls.
-
Dec 2000
Reroofing.
-
Jul 2004
One bathroom handicap accessible, new 8'-0" high one hour rated gypsum board wall, h.cp handrails with.
-
May 2008
To renew permit 200604219600.
-
Mar 2010
2nd floor - removal of interior partitions, 2nd floor, vacant space (soft demolition) per ab-017.
-
May 2010
Interior soft demolition of existing vacant office. interior work only.
-
Aug 2010
Construction of an internal non-load bearing cantilevered wall at the 1st floor. upgrade existing ramp to full access compliance. work in the art gallery tenant space only.
-
Nov 2010
Office ti on 2nd, 3rd and 4th floors. barrier removal consisting of replacement of existing accessible bathrooms and existing non-accessible kitchenete ( on 2nd fl), and widening doors on 2nd floor. install new enclosed utility closet and rated air shaft.
-
Apr 2016
4th floor: new lighting & controls on the 4th floor, t-24 compliance; maher n/a.
-
May 2021
Change of use from retail service to bar: new bar & prep area. new plumbing at areas. no structural. no ada. no mechanical. no major electrical. maher n/a.
DBI holds 49 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 49. 14 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update