  1. July 17, 1906

    Reed & Co. contracted for excavation on a building, at $14,403.

    The San Francisco Call, 17 July 1906, p. 11
  2. 1907

    Built.

  3. 1907

    The Hotel Regent, designed by Hemenway and Miller, dates from 1907.

    San Francisco Planning Department, 475 Brannan Street: Draft Environmental Impact Report, Case No. 97.470E, 1998.
  4. April 17, 1907

    M. Cohen & Co., Decker Electrical Company, Colusa Sandstone Company, A. Amerle & Co., Ralston Iron Works, J. G. Sutton & Co., Globe Sheet Metal Works, Standard Roofing Company and Otis Elevator Company contracted to put up a seven-storey building, at $143,335.

    The San Francisco Call, 17 April 1907, p. 11
  5. Aug 1984
    Permit 8408435 $$$ $133,589

    Sprinkler system.

  6. Aug 1984
    Permit 8408721 $$$ $15,000

    Replace sidewalk, install pge transformer.

  7. Aug 1984
    Permit 8408722 $$$ $15,000

    Install non-bearing partition wall.

  8. Dec 2001
    Permit 200112175365 $$$ $560,000

    Umb seismic upgrade special procedure with bolts plus @ 2/f to 7/f ada compliance work.

  9. Dec 2002
    Permit 200212234048 $$$ $100,000

    Renovation of existing tenant space commercial/area 1st floor to meeting room, bathrooms, lounge.

  10. Feb 2003
    Permit 200302218000 $$$ $45,000

    Installation of new fire alarm panel due to remodel on the 1st, 3rd, 4th, 5th & 6th floors.

  11. Mar 2006
    Permit 200603317995 $$$ $12,000

    Add four devices for elevator recall due to elevator modernization.

  12. Nov 2017
    Permit 201711224717 $$$ $10,000

    Two rooms. renovation of a single hotel guestroom and 2 guest bathrooms. work shall include replacement of plumbing fixtures and finishes. replacement of corrodor lights. maher na.

  13. Feb 2018
    Issued Permit 201802131182 $$$ $94,103

    Alteration: renovation of 5 accessible guest bathrooms. work shall include replacement of plumbing fixtures, partitions, finishes and doors. rooms include #311, 406, 506, 606, 711. no fire alarm or sprinkler work per this permit scope of work. n/a for maher.

  14. Apr 2018
    Issued Permit 201804045507 $$$ $430,000

    Reno of 91 out of 96 guest bathrooms. work shall include replacement of plumbing fixtures, a-2 bathroom doors and 11 guest entry doors, and modification of 49 bathroom doors and replacement of guest floor corridor lighting.

  15. Apr 2018
    Reinstated Permit 201804206916 $$$ $330,000

    Renovation of level 1 public spaces, and basement fitness room and office. work includes non-structural demolition and construction of walls, doors, ceilings and finishes. mep, fire alarm and sprinkler scope to be addressed in separate permit. n/a for maher.

  16. Aug 2018
    Issued Permit 201808167519 $$$ $30,000

    Floors 2-7: revision to permit application 201804045507; consist of interior modifications to guest level corridors. scope includes electrical & plumbing work for corridor amenity stations and new lighting. no exterior work. no change to guest room count. maher na.

  17. Oct 2018
    Permit 201810294425 $$$ $101,000

    Interior modifications limitted to level 1 reception cafe and library bar. new casework, door and finishes. new electrical and plumbing and food service equipment. fire alarm/sprinkler to be addressed in seperate permit. deferred mechanical.

  18. Oct 2018
    Permit 201810294431 $$$ $60,000

    Electrical work to support renovation of level 1 public spaces. work includes new lighting and electrical. cafe, library bar, fire alarm and sprinkler scope to be addressed in seperate permit. n/a for maher. electrical for new sidewalk lift.

  19. Nov 2018
    Issued Permit 201811054935 $$$ $81,000

    Minor permit to alter consits of replacing selected existing wood single hung windows in-kind with newwood single hung windows, scope limited to guest room at suter st facade. now work to be done to level 1 storefront glazing.

  20. Nov 2018
    Permit 201811054938 $$$ $67,000

    Facade modifcations, limited to fire escape ladder & ground fl storefront zone, scope inlcudes new finishes & fixed marquee. demolition of existing fabric awnigs, decorative architrave & column strouds. signage under separate permit.

  21. Nov 2018
    Issued Permit 201811166147 $$$ $102,000

    Building permits #2018-0404-5507, revision: 2018-0816-7519, revision: 2018-0914-0225 as part of a building renovation project new notifier nfs2-3030 is being installed.

  22. Jan 2019
    Permit 201901311729 $$$ $35,550

    Replace e fire pump with code legal fire pump of equal pressure & flow rates. ref ti 201810294425. n/a for maher.

  23. Mar 2019
    Issued Permit 201903215895 $$$ $242,000

    Permit consists of modifications to basment maintenance room and office to support new sidewalk lift and machine room. existing lift gate opening at sutter st sidewalk to be revised; no change to sidewalk grading. new lift pit. no structural modification to sidewalk.

  24. Nov 2019
    Permit 201911126929 $$$ $10,000

    Install 1 illuminated single-faced sign on existing canopy. "hotel emblem".

DBI holds 44 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 44. 3 of them are nominal $1 street-space or sidewalk permits. 4 expired permits are not shown.