37.7894, −122.4098 A locator map appears here once a Mapbox token is configured.

562–570 Sutter Street

Nob Hill · San Francisco, CA 94102

  • Built 1907
  • Hotel
  • 7 stories
  • Zoned C3R
  • District 3
  • Historic status: historic resource
37.7894, −122.4098 Street View appears here once a Google Maps embed key is configured.
41,272 sq ftBuilding area
6,847 sq ftLot area
113Rooms

Permit history

  1. Jan 1984

    New one hour wall and door at 1st floor stair #3.

    Expired Permit 8400162 $$$ $150,000
  2. Aug 1984

    Sprinkler system.

    Complete Permit 8408435 $$$ $133,589
  3. Aug 1984

    Replace sidewalk, install pge transformer.

    Complete Permit 8408721 $$$ $15,000
  4. Aug 1984

    Install non-bearing partition wall.

    Complete Permit 8408722 $$$ $15,000
  5. Nov 1984

    Install kitchen, paint wall, install hoods.

    Expired Permit 8412104 $$$ $30,000
  6. Oct 1998

    Reroofing.

    Expired Permit 9821343 $$$ $44,000
  7. Dec 2001

    Umb seismic upgrade special procedure with bolts plus @ 2/f to 7/f ada compliance work.

    Complete Permit 200112175365 $$$ $560,000
  8. Dec 2002

    Renovation of existing tenant space commercial/area 1st floor to meeting room, bathrooms, lounge.

    Complete Permit 200212234048 $$$ $100,000
  9. Feb 2003

    Installation of new fire alarm panel due to remodel on the 1st, 3rd, 4th, 5th & 6th floors.

    Complete Permit 200302218000 $$$ $45,000
  10. Dec 2005

    Modernize existing elevator installation. comply with all aspects of title 24 accessibility requirements except for cab size and door opening, which are constrained by limitations of existing construction. replace lift mechanism, add seismic reinforcement to hoistway, and modify elevator penthouse to accommod.

    Expired Permit 200512271072 $$$ $90,000
  11. Mar 2006

    Add four devices for elevator recall due to elevator modernization.

    Complete Permit 200603317995 $$$ $12,000
  12. Nov 2017

    Rooms #710 & 711. renovation of a single hotel guestroom and 2 guest bathrooms. work shall include replacement of plumbing fixtures and finishes. replacement of corrodor lights. maher na.

    Complete Permit 201711224717 $$$ $10,000
  13. Feb 2018

    Alteration: renovation of 5 accessible guest bathrooms. work shall include replacement of plumbing fixtures, partitions, finishes and doors. rooms include #311, 406, 506, 606, 711. no fire alarm or sprinkler work per this permit scope of work. n/a for maher.

    Issued Permit 201802131182 $$$ $94,103
  14. Apr 2018

    Reno of 91 out of 96 guest bathrooms. work shall include replacement of plumbing fixtures, a-2 bathroom doors and 11 guest entry doors, and modification of 49 bathroom doors and replacement of guest floor corridor lighting.

    Issued Permit 201804045507 $$$ $430,000
  15. Apr 2018

    Renovation of level 1 public spaces, and basement fitness room and office. work includes non-structural demolition and construction of walls, doors, ceilings and finishes. mep, fire alarm and sprinkler scope to be addressed in separate permit. n/a for maher.

    Reinstated Permit 201804206916 $$$ $330,000
  16. Aug 2018

    Floors 2-7: revision to permit application 201804045507; consist of interior modifications to guest level corridors. scope includes electrical & plumbing work for corridor amenity stations and new lighting. no exterior work. no change to guest room count. maher na.

    Issued Permit 201808167519 $$$ $30,000
  17. Oct 2018

    Interior modifications limitted to level 1 reception cafe and library bar. new casework, door and finishes. new electrical and plumbing and food service equipment. fire alarm/sprinkler to be addressed in seperate permit. deferred mechanical.

    Complete Permit 201810294425 $$$ $101,000
  18. Oct 2018

    Electrical work to support renovation of level 1 public spaces. work includes new lighting and electrical. cafe, library bar, fire alarm and sprinkler scope to be addressed in seperate permit. n/a for maher. electrical for new sidewalk lift.

    Complete Permit 201810294431 $$$ $60,000
  19. Nov 2018

    Minor permit to alter consits of replacing selected existing wood single hung windows in-kind with newwood single hung windows, scope limited to guest room at suter st facade. now work to be done to level 1 storefront glazing.

    Issued Permit 201811054935 $$$ $81,000
  20. Nov 2018

    Facade modifcations, limited to fire escape ladder & ground fl storefront zone, scope inlcudes new finishes & fixed marquee. demolition of existing fabric awnigs, decorative architrave & column strouds. signage under separate permit.

    Complete Permit 201811054938 $$$ $67,000
  21. Nov 2018

    Building permits #2018-0404-5507, revision: 2018-0816-7519, revision: 2018-0914-0225 as part of a building renovation project new notifier nfs2-3030 is being installed.

    Issued Permit 201811166147 $$$ $102,000
  22. Jan 2019

    Replace e fire pump with code legal fire pump of equal pressure & flow rates. ref ti 201810294425. n/a for maher.

    Complete Permit 201901311729 $$$ $35,550
  23. Mar 2019

    Permit consists of modifications to basment maintenance room and office to support new sidewalk lift and machine room. existing lift gate opening at sutter st sidewalk to be revised; no change to sidewalk grading. new lift pit. no structural modification to sidewalk.

    Issued Permit 201903215895 $$$ $242,000
  24. Nov 2019

    Install 1 illuminated single-faced sign on existing canopy. "hotel emblem".

    Complete Permit 201911126929 $$$ $10,000

DBI holds 44 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 44. 3 of them are nominal $1 street-space or sidewalk permits.

Not yet documented: the architect and builder and the early tenants. Submit an update