861 Sutter Street
Nob Hill · San Francisco, CA 94109
Permit history
-
Nov 1987
Parapet reinforcement.
-
Jan 1996
Reroofing.
-
Oct 1998
Umb - seismic upgrade.
-
Jul 2015
One unit: replace kitchen cabinets, flooring, tile, fixtures & paint. replace tile & fixtures in kitchen & bathroom.
-
Mar 2017
Renovation of three units including new bedrooms, new laundry, renovation of kitchens and baths. new lighting, new partitions and revised heating. no exterior work. maher na.
-
Mar 2017
#503: renovation of existing apartment on 5th floor including new bedroom, new laundry, renovated kitchen and bath, new lighting revised heating.
-
Jun 2017
One unit 4th level: renovate including addition of new bedroom, new laundry. renovate kitchen & bathroom, new lighting. no exterior work.
-
Jun 2017
Renovation of one unit 2nd fl including new bedroom, new laundry, renovate kitchen and bath, new lighting, revised heating. no exterior changes. replace 2 windows in kind, maher not req.
-
Jul 2017
One unit: 4th fl: renovation to include new bedroom, new laundry, renovate kitchen & bath, new partitions & new lighting. no exterior changes. maher na.
-
Aug 2017
Renovation of one unit on the 3rd fl. including a new bedroom, new laundry, renovate kitchen and bath, and new lighting. no exterior work. maher na.
-
Nov 2017
#501- renovation of one unit 5th lvel including new bedroom, new bath, renovated kitchen, bath, new lighting, revised heating, no ext changes.
-
Nov 2017
Renovation of one unit on top floor including new bedroom, new laundry, renovated kitchen and bath, new lighting, revised heating, no exterior changes.
-
Nov 2017
One unit-3/f: renovation, new bedroom, launry, renovated kitchen and bath, new lighting, revised heating, no exterior changes.
-
Jul 2018
F/a: replacement of existing fire alarm control unit and 30 smoke detectors on a like-for-like basis.
-
Apr 2019
Conversion from stuido to 1 bedroom in seven units. conversion from 1 bedrm to 3 bedrm with asst of new bathroom and remodel of 402. new kitchen cabinets/plumbin fixtures/lighting @ existing j-box locations. nwe dishwashers, with d; no change to mechanical, ext, fire, life safety or struct.
-
Sep 2019
Remodel kitchen & bathroom for five units. kitchen 45 sq ft each. new counter, cabinets and plumbing fixture in kind. bathroom 35 sq ft. new tile, vanity & fixture in kind. no change to mechanical, no exterior work, no fire alarm/sprinker work no structural. no wall to be altered.
-
Sep 2019
Reno of 8 apt one unit on 2nd level, two units on 3rd, one unit on 4th, two units on 5th, one unit on 6th. 302, 502, 508, 601 - new bedrms. all units - new kitchen cabinetrs & plumb fixtures, with d & d/w, lighting at existing jboxes. no change to mechanical/struct/fire systems.
-
Nov 2019
One unit 1st floor: renovation of one apartment. new bedroom. new kitchen cabinets and plumbing fixtures. new washer, dryer, and dishwasher. new lighting at existing j-box locations. no change to mechanical. no fire alarm, sprinkler work. no structural work.
-
Dec 2019
One unit: renovation of apartment. new bedroom, new kitchen cabinets and plumbing fixtures.new washer/dryer & dishwasher. new lighting at existing j-box locations. no change to mechanical. no exterior work. no fire alarm or sprinkler work.
-
Jan 2020
One unit, 5th fl - new bedroom, new kitchen cabinets & plumbgin fixtures. new washer, dryer, dishwasher, new lightin at existing j-box locations. no change to mechanical. no exterior work, no fire alarm, sprinkler work. no structural work.
-
Mar 2020
Replacement of (91) windows due to severe water damage, no windows visible from the street, replace existing vinyl single hung with new vinyl single hung windows. like for like.
-
Mar 2020
Replacement of (9) street facing windows due to severe water damage, alwindows visible from the street, replace woodcasement windows"like-for-like" all decorative trim to remain.
-
Oct 2020
Upgrade with lf horns to meet sffc 2019 sec 1103.7.6.1 replacementof existing facu with a new ifp-75 facu, installation of a new aes 7707, replacement of existing smoke detectors, replacement of existing pull stations, replacement of existing notification appliances with new motor bell, installation.
-
Oct 2020
Adding nine (9) units on lower & upper basement levels per ordinance 162-16. convert existing basement into new dwelling units within existing envelope. new bedrooms, new bathrooms, new dishwashers, new washer/dryers.
-
Jun 2024
Reroofing.
DBI holds 36 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 36. 6 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early residents. Submit an update