940 Sutter Street
Nob Hill · San Francisco, CA 94109
-
June 6, 1951
The Office of the Assessor-Recorder photographed the property for tax assessment. Hotel Empire was at the address.
-
Oct 1983
This is not any addition or actual alteration of rooms.
-
Apr 1984
Additions alterations or repairs.
-
Dec 1984
Alterations to existing bar area plush room cosmetic work.
-
Feb 2000
To install (1) fire panel, annunciator, manual pull stations, smoke det heat det muni horns.
-
Nov 2003
Voluntary upgrade-structural reinforcement, shotcrete & concrete shearwalls with footings, steel frame to.
-
Sep 2007
Remove ~ 6ft. of non bearing partition and some soffitt for new bathroom configuration/ new plumbing fixtures.
-
Dec 2007
Hotel bathroom remodel - create 5 accessible suites. relocate / dher additional suites for cbc 1111b.4.6. bathroom / closet partitions.
-
Nov 2008
Interior remodel of existing ground fl. bar and dining room with new finishes throughtout. expansion of existing ground fl. kitchen, including new finishes and equipment. mechanical, electrical, plumbing & life safety under separate permit.
-
Jan 2009
Mechanical, electrical & plumbing systems for interior remodel of an existing bar/restaurant. proved new equipment and ventilation system. ref. #200811066082.
-
Mar 2011
To complete work and obtain final inspection for work approved under permit application 200712311650.
-
Dec 2014
On 1st floor - change of occupancy - renovate former restaurant(a2) into 6 new hotel rooms (r1), renovate existing bar into service area & re-open courtyard previously enclosed for restaurant use. mep under seperate permit. n/a ordinance #155-13.
-
Dec 2015
Recofigure existing ground floor toilets, exercise room and storage to one guest room, accessible toilets, exersice room and buisness center. add and relocate doors at courtyard to allow two means of egress for public assembly. ref app#201412083220 r-1. n/a for mahersprinklers-fire alarm separate permit.
-
Dec 2019
Renovation of the existing vertigo hotel. work is being done to floors 1-2 only. renovations on level, include to lobby/reception area, moving fitness center to new location. adjusting small office space and adding a small kitchen. the level 2 renovations include coverting guestroom to lounge.
-
Aug 2022
Add ada chair lift at entry (platform lift) demolish existing entry stair to accomodate new platform lift. build new stairs.
-
Nov 2022
Lobby/reception area construction of existing fitness center and existing guestroom 102. create new kitchen and adjusting of office space. the 2nd fl renovation included removing 1 guestroom and converting it into small lounge area.
-
Apr 2023
In-kind window replacement, remove existing aluminum windows in guest rooms from north elevation lvls 1-8 and interior court yard elevations lvls 2-8, no increase in sq ft, no change to egress. 125 windows total.
-
Jul 2023
1st and 2nd floors: building mep upgrades.no architectural. ref to 201912311068 lobby & mezz remodel.
-
Jul 2023
3rd and 4th floors: building mep upgrades.no architectural work.
-
Jul 2023
5/f & 6/f: mep upgrades. no architectural work.
-
Jul 2023
7/f & 8/f: building mep upgrades. no architectural work. new roof equpment. (entire building upgrade in separate permits).
-
Nov 2023
Interior renovation e bars & kitchen. no structural change. mep deferred.
-
Dec 2023
T.i. upgrad existing fire alarm slystem to accommodate the 1st and 2nd fl. rennovation changes, install low frequency sounders in all units and include elevator recll.
-
Jan 2024
Deferred electrical and plumbing work on existing bar and kitchen, ti under permit application 202311271378.
-
Aug 2024
Updated evacuation signage package.
DBI holds 51 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 51. 1 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update