Permit history
-
Feb 1982
Wall or painted sign.
-
Jan 1983
Reinforcement of doors.
-
Nov 1985
Bring building. into full compliance with provisions.
-
Dec 1988
Parapet reinforcement.
-
Dec 1988
Installation of security office & iron gate with door.
-
Jan 1997
Const & operation of antenna and associated equipment.
-
Jun 1997
Replace existingwindows with alum windows.
-
Apr 1998
Reroofing.
-
Aug 1998
Remodel bar.
-
Feb 2000
Replace antennas, new communication cabinets &coaxial cable.
-
Mar 2000
Install non-structural wall with 30 in door/close door to closet-remove walk-in refrigerator-ref9817857.
-
Feb 2003
To install fire sprinkler system to comply with ordinance #172-02.
-
Aug 2004
Install 1 dact to monitor 1 existing facu monitoring.
-
Dec 2004
Renew app #2004080609140.
-
May 2005
Renew expired permit 200302147534.
-
May 2012
Mechanical fan-duct & vent + 20 amp circuit for existing sprint cell site in existing basement, less than 50 gallons of electrolite is existing (verify in field).
-
Jun 2012
4 existing panel antennas to be removed and 3 new panel antennas to be installed with blinders. 3 equipment cabinets to be removed and 2 cabinets to be installed.
-
Aug 2012
Fire alarm system replacement on a 1 for 1 basis per sffd interim facp replace guidelines, per sffd current facp replace guidelines eff 7/1/12. while ab-3.04 is under revision, the existing facp on a 1 for 1 basis per csfm information bulletin dated 9/4/08 see sht fa-17 for copy of bulletin with sffd.
-
Jun 2013
To comply with ordinance 029-13 only. to install 8 grab bars on 1st floor, 8 grab bars on 2nd floor, 8 grab bars on 3rd floor, 8 grab bars on 4th floor, and 8 grab bars on 5th floor.
-
Sep 2014
Remove (3)nv 800/1900 antennas(1)each a sectors a, b & c/add(3)triband panel antennas(1)each at sectors a, b & c/add(3) 2.5 rrh(1)each at sectors a, b & c/add new coax jumper lines fr rrhs tonewantennas/re-useexistinghybrid cables or installnew as needed/addnew2.5 equipmet insideexistingmmbs cabinet/add new 2.5.
-
Nov 2014
Install ventilation, light fixtures in 6 bathrooms, 1 bathroom on floors 2, 3, 4, 5 & 6 & 1 bathroom in managers dpt. (2/f) to comply with nov #201492322 item 2. lighting shall be high efficacy & exhaust termination 3' from pl & openings into building to lightwell. n/a ordinance #155-13.
-
Nov 2015
To obtain final inspection for work approved under permit application 2013-0614-9644. all work is complete.
-
Mar 2016
To comply with complaint # 201690652, (item # 2 only ) concrete spall & crack repairs on north & west elevations of east wing, 30 sq ft of spall repairs & 30 sq ft of crack repairs, this isless than 5% of the cross section of hte wall.
-
Jul 2022
Remove existing equipment, including electrical connections, off of the existing rooftop telecommunications site.
-
Jun 2023
Upgrade to existing commercial entry per ordinance# 51-16 abe program. to comply with abe# 201812173101. install power door operator. replace door with compliant width.
DBI holds 28 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 28. 1 of them are nominal $1 street-space or sidewalk permits.