1412–1414 Van Ness Avenue
Nob Hill · San Francisco, CA 94109
-
1912
Recorded in the city's survey of the Van Ness Avenue automobile corridor as built for use as a tire store, auto showroom 1, 3. The survey dates the work to 1912–1913.
-
1913
Built for the Firestone Tire and Rubber Company, which took half the building; the rest was an auto showroom. Vehicles moved between floors by elevator rather than the usual ramp. The Firestone Tire and Rubber Company's San Francisco factory branch, 1913–1923, occupying half the building. The rest was an auto showroom, and later the whole of it was.
-
Jan 1983
Remove existing partition walls.
-
Mar 1983
Additions alterations or repairs.
-
Nov 1983
Add 10 ton heat pump to meeting room a.
-
Jul 1987
Interior remodel.
-
Jul 1987
Interior demolition. metal stud, drywall, paint.
-
Oct 1987
Fire sprinkler.
-
May 1989
Parapet reinforcing.
-
Apr 1990
Repair test holes (interior) repair broken skylight.
-
Nov 1993
Remove existing non-structural partition walls.
-
Feb 1994
Minor demolition n/b partit & soffits new full lit n/b demising wl.
-
Mar 1999
Umb upgrade with access compliance work.
-
Jun 1999
To erect electrical sign.
-
Feb 2000
Storefront alteration only.
-
Feb 2000
Interior t/i new partitions new casework new finishesnew lighting.
-
May 2000
To erect electrical sign.
-
Apr 2002
Shoring and underpining east perimeter for adjacent construction at 1452 bush st./2001010593215.
-
Jun 2005
Erect a single faced projecting electric sign.
-
2010
Evaluated in the city's survey of the Van Ness Avenue automobile corridor and given California Register status code 3CS — individually eligible for the California Register.
-
Oct 2012
Change of use of the existing ground floor retail space to an institutional (business) use, "the miami ad school", new accessible men's bathroom, (2) new classrooms.mep under seperate permit.
-
Feb 2013
To erect illuminated electrical sign(exterior).
-
Sep 2016
Second floor office ti - including demolition of portion of existing hardwd ceiling, new partitions, new carpet & paint.
-
Dec 2016
Revision to 201609238685 new restroom plumbing fixtures and finishes. no change to ceiling (previously shown removed) revised lighting, ti only, no exterior or change to bld structure.
-
Feb 2020
Demolition of 1st fl interior space in prep for new tenants who will fire for improvements under a separate permit. ab-017.
-
Mar 2020
9459 sq ft interior only. t.i @ 1st floor only. ada comliant bathrooms and changing rooms, modification of existing lighting mechanical, electrical, and plumbing interior finishes. chnage of use from design school back to retail space and services.
-
Apr 2021
New dedicated function fire alarm system for sprinkler monitoring and elevator recall t.i. permit # 2020-0311-6749.
DBI holds 29 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 29. 2 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update