1485–1487 Bush Street
Nob Hill · San Francisco, CA 94109
-
1912
Built at large-apartment scale at the corner of Van Ness Avenue but opened as a hotel for temporary guests rather than long-term flats.
-
Mar 1984
Sign - erect.
-
Jan 1989
Parapet reinforcing.
-
Jul 1996
Antenna.
-
Aug 2002
Seismic retrofit works umb general procedure.
-
Apr 2003
To install fire sprinkler system to comply with nov 200235645.
-
Oct 2005
In kind replacement of antennas.
-
Oct 2006
Renew 200208214594. mandatory umb project.
-
Jul 2008
Reroofing.
-
Dec 2010
Addition of two new exhaust ducts routed to 2 existing exterior vents with high capacity for on each duct, a new intake vent and a new hydrogen monitor.
-
Sep 2011
Addition of process colling equipment to an existing unmanned telecommunciation facility in existing basement, plus a new hvac condenser uhnit on a new mechanical equipment pedestal on roof. no changes to antennas or cabinets.
-
Feb 2012
Site plan: change of use (from m to b). add oven, fryer, grill; install hood (ventless).
-
Nov 2013
Remodel bathroom and replace kitchentte one unit-407. open up walls as needed for electrical and plumbing work. install lights in bathroom to meet title 24, cec 150(k). no window changes. new fan to existing duct.
-
Mar 2014
Remodel bathroom and replace kitchenette one unit-307. open walls as needed to do plumbing and electrical work. new lights in the bathroom to meet sc cec 150k, new sheetrock on all open walls. no window change; no structural work, bathroom fan to connect to flue.
-
Mar 2014
Comply with complaint 201450161remodel bathroom and replace kitchenette one unit-107, open wall and ciling as needed to do plumbing and electrical work. new lights in bathroom to meet cec 150k, new sheetrock on all open walls. no window change, no structural work. bathroom fan to connect to existing flue pipe.
-
Mar 2014
Remodel bathroom and replace kitchenette one unit-207. open walls and ceiling as needed to do plumbing and electrical work, new lights in bathroom to mec cec150k, new sheetrock on all open walls. no window change, no structural work, bathroom fan to connect to existing flue pipe.
-
Mar 2014
Reroofing.
-
Sep 2014
Repair all existing windows by replacing all window sashes with in-kind wood window sashes to match existing window sashes. window frame to remain the same. 62 windows. no structural work. install double glazed glass.
-
Dec 2014
Installation of new windows on existing openings at ground floor. commercial space is vacant. n/a maher ordinance. ab-017 applies.
-
Jun 2015
Remove and replace 3 existing antennas with 3 new 4'-0" antennas on existing mast adjacent to antennas. install 3 new rru s - iis adjacent to antennas. replace dul20 with new dus4i main unit. n/a for the maher. for t-mobile.
-
Feb 2016
A modification to an existing unmanned telecommunication facility consisting of: reanchoring existing pbc 6500 on new wf sleepers. adding batteries ot existing pbc 6500 for a total of (20) batteries. n/a maher ordinance.
-
Nov 2016
Remove (6) existing antennas; install (6) proposed antennas; remove (6) tma's; install (6) #6 awg dc cables; remove (1) pbc 6500 cabinet; install (1) pbc 6200 cabinet install (3) proposed rru's.
-
Jul 2018
T-mobile modify electrical system by removing 4 unused cabinets and installing 1 new cabinet, 1 new 19" rack, 1 subpanel within meter panel and associated conduits and accessories. equipment room is in basement. maher n/a.
-
Sep 2020
T-mobile modification remove & replace 6 antenna / install 3 rru / site support unit.
-
Sep 2022
Dish wireless, install (3) new antennas, (6) n rrus, (1) n cabinets, (2) n batteries.
-
May 2025
Emergency repair of leaking fire serive, saw cut sidewalk & excavate (3' x 9'). replace leaking pipe with new pipe. backfill excavation & repave sidewalk.
DBI holds 53 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 53. 6 of them are nominal $1 street-space or sidewalk permits.