1363–1371 Grant Avenue
North Beach · San Francisco, CA 94133
-
1982
Recorded in the city's 1982 survey of North Beach, adopted by the Board of Supervisors in 1999, as a contributor to the Upper Dupont Street / Grant Avenue District.
-
Dec 1986
Bring building into code per dahi.
-
Mar 1987
Tear up exist basement floor (wood).
-
Oct 1987
Sheetrock ceiling in basement.
-
Jan 1989
Sheetrock & electrtcal outlets.
-
May 1989
To legalize the use of 1363 thru 1371 as one bar.
-
Jan 2001
Removal of dry rot.
-
Jan 2001
Partial demolition of one existing restrm to rebuild an accessible unisex restrm. paint & patch exis.
-
Mar 2001
Erect non-electric double faced sign.
-
Feb 2004
Looking for assignment of occuancy load. change of occupancy to a3 from b.
-
Dec 2004
Remodel existing bath & kitchen at one unit, including replacing the ressilient flooring in kit & tile in.
-
Mar 2005
Remove & replace sidewalk over subsidewalk space @ north side of property. install steel frame @.
-
Aug 2005
Delete voluntary seismic improvements on 1st fbar & the related access imrpovements associated with.
-
May 2006
Remodel 1 kitchen & 1 bathroom. no structural work.
-
Jan 2007
Renew permit application 200605242397 for final inspection.one unit.
-
Aug 2007
Replace sidewalk door in kind.
-
Sep 2015
For residential cost estimation: soft story retrofit per sfbc chapter 34b, engineering design criteria based on 2012 iebc appendix a-4. improvement @ 1st floor/basement. some ada imrpovement @ entry & bath for 20% upgrade. replace existing door @ front entrance & add new hadrail @ front step &.
-
Sep 2015
For commercial area cost estimation: soft story seismic retrofit per sfbc chapter 34b, engineering criteria base on 2012 iebc appendix a-4. improvement @ 1st floor, basement, other some ada for 20% upgrade including replacement of door at front entrance, add new handrail & restroom upgrade.
-
Jan 2018
Mta only.
-
Nov 2023
Renovation of existing bar with new bar, accessible entry, accessible bathroom, new stairs, new partitions, new lighting and electrical, new equipment.
-
Jan 2024
Upgrade existing fire alarm devices to be replaced to include manual pull stations and smoke detectors, existing bells to be replaced with horn strobes and strobes. units to have 520hz low frequency audibles installed. fire alarm control panel shall be monitored with starlink 24v cell gms-sole path comm.
-
Mar 2024
Renovation of unit's 1 and 4: new kitchen cabinets, renovations of bathrooms, texture, paint and flooring. (2) kitchen remodel in-kind. (2) bathroom remodel in-kind. no moving walls, no layout changes.
3 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Not yet documented: the architect and builder and the early residents. Submit an update