755 Ocean Avenue
School building · Oceanview / Merced / Ingleside
-
1955
Built.
-
Mar 1983
Lick-wilmerding high school/relocation of library.
-
Mar 1991
Remove skylight & roof new structural roof & wall.
-
November 9, 1995
The City Planning Commission approved with conditions, 4-1, a planned unit development remodelling and adding to Lick-Wilmerding High School, with a new 18,000-square-foot library and arts building and an 8,000-square-foot student centre (Motion 14006).
-
Dec 1995
Erect a two story educational structure.
-
Apr 1997
Relocate dance classrm to other side of corridor.
-
Apr 1997
Convert design & drafting classroom into music dept.
-
April 24, 1997
The City Planning Commission approved with conditions, 5-0, eight Nextel Communications antennas on the roof of the three-storey Lick Wilmerding High School building, about 25 feet tall (Resolution 14361).
-
Jan 2002
Renovation of an existing school teater on the 2nd floor- new seating for a total of 411 seats.
-
Feb 2002
New horizontal extension to existing building to provide new lab class rooms.
-
Feb 2002
Horizontal of existing building to new classrooms at 1st fl level, south.
-
April 11, 2002
The City Planning Commission approved as amended the planned unit development to reconfigure and expand the existing private secondary school with two below-grade buildings adding approximately 17,000 square feet and three classrooms, denying the windmill aspect of the project.
-
April 11, 2002
The property held an existing private secondary school, Lick-Wilmerding High School.
-
Apr 2005
Const enclosed mezzanie above for storage, remove a raised fl and replace with new floor.
-
Jun 2008
Conversion of (1) existing classroom into (4) private offices & (1) office suite on 2nd floor. mechanical & electrical work under separate permit.
-
Mar 2011
Voluntary structural strengthening to gym roof & wall structure. upgrade existing disabled access restrooms on main level.
-
Jan 2015
Voluntary seismic upgrade to classroom roof and wall connection. n/a ordinance #155-13.
-
Apr 2016
Repair to l.w.h.s library building caused by water intrusion - remove & replace stucco & windows on south elevation.
-
Jul 2016
Selective demolition & full renovation of existing 2 story building with historic facade & 3rd story addition to classroom building. selective demolition & partial renovation of existing science classroom & addition of restrooms @ theatre building. addition of newly enclosed alley space between classrm & theatre blg ** maher: n/a **.
-
Jun 2017
Reroofing.
-
Apr 2018
242.64 kw roof mounted solar installation.
-
Dec 2019
New roof and mechanical units at library: windows replacement at library window. repairs or replacement at gym.
-
May 2021
Library mechanical improvements. ref permit application 201912189952.
-
Feb 2024
All existing mechanical units and associated duct work are to be removed to allow for support & assembly & upgrades. all existing roofing and membrane will be removed and replaced with an sbs-modified 2 ply roofing system, along with new drains and overflow systems. new mechanical units and associated.
-
Jun 2024
Replacement of e gym floors, 2 telescoping bleachercs, 6 backstops with associated support and power.
-
Mar 2026
New pergola (freestanding) at an existing courtyard space between the existing classroom building and theatre building.
DBI holds 122 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 122. 12 of them are nominal $1 street-space or sidewalk permits. 4 expired or cancelled permits are not shown.