90–100 34th Avenue
Outer Richmond · San Francisco, CA 94121
-
1935–1941
The Works Progress Administration rehabilitated the Palace of the Legion of Honor in Lincoln Park, and built a modern clubhouse for the municipal golf course on the same address.
-
Sep 1986
Construct metal stud & gypsum board sound baffle at rear.
-
Nov 1986
Remove existing orchestra pit, install new plaster cornice.
-
Mar 1987
Install wheel chair lift at legion of honor.
-
Sep 1987
Install garaventa model gsl i/inclined wheelchair lift.
-
Feb 1989
Prepare existing elevator shaft walls for elevator.
-
Oct 1989
Replace six wood windows at the clerestory of main exhibit.
-
Jun 1992
Seismic upgrade/1st fl & basement to be renovated/upgraded.
-
Feb 1995
Revise replace early warning fire protection system.
-
Feb 1995
Access improve to provide seating for h.c., path of travel.
-
May 1995
Fountain renovation/site work inc asphalt/paving/addit 2 lig.
-
Oct 1995
Fence & gate installation -- region of honor.
-
May 1996
Replace of existing fence at equipment pad.
-
Jun 1998
Conversion of storage room into corridor extension less than.
-
Aug 2000
Grading.
-
Apr 2002
Ref. appl#9210760 remove topping slab, install structural supports, reinstall travertine to match (e.
-
May 2007
Replacement of existing chiller like in kind. actual work being done in an alternate building on the property not in the historic portion.
-
Sep 2011
Remodel of existing restrooms to comply with ada. remodel of main entrances on both restrooms. remodel of both women's and men's restroom, drinking fountain and roof repair, new wall and floor finishes.
-
Oct 2011
Voluntary accessibility upgrade at parking area.
-
Sep 2012
Construct temporary walls and plywood floor protection of an existing art gallery. temp wall includes a viewing window & one (1) doubled door unit.
-
Apr 2013
Interior remodel of existing art gallery, selective demolition of existing wall and ceiling, frame new wall & add new lighting fixtures, electrical, fire alarm work, modify existing fire sprinklers & hvac ductwork, new drywall and flooring systems.
-
Apr 2013
Barrier removal/ada upgrade to existing men's & women's restrooms. the work includes selective demolition of existing toilets, partitions, and reconfiguring restrooms to accomodate a compliant handicap stalls. therew will be replacement of the existing drinking fountain to an ada compliant unit.
-
May 2017
Replacement of existing simplex fire alarm system to edwards est3 utilizing existing location. installation of new documentation cabinet in fire control rm. replacement of all existing initiating devices (detectors, manual stations & modules). replacement of existing notification devices. new power supply installation.
-
Apr 2022
Demolition of existing millwork, carpet, gyp bd ceiling (existing framing to remain for reuse), light fixtures, mechanical linear diffusers and ceiling mounted devices. remove existing layer of gyp bd and plywood backing, from existing metal stud framing scheduled for reuse. scope of new work will include gallery.
-
May 2025
Concrete slab on piers with 42 in perimeter wall for sq ft irish famine memorial plaza.
DBI holds 36 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 36.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update