37.7799, −122.4980 A locator map appears here once a Mapbox token is configured.
Know This Place

District 1 · Block 1469A, Lot 003 · ZIP 94121

475 37th Avenue

Single-family house

  • 3 stories
  • 2,978 ft2
  • 3,600 ft2 lot area
  • 12 rooms
  • 5 bedrooms
  • 3 bathrooms
  • Wood frame
  • Zoned RH-1
  • Sold July 17, 2014
37.7799, −122.4980 Street View appears here once a Google Maps embed key is configured.
  1. 1919

    Built.

  2. between 1947 and 1951

    The Office of the Assessor-Recorder photographed the property for tax assessment.

  3. Apr 1989
    Permit 8906171 $$$ $8,500

    Bathroom and kitchen remodeling.

  4. May 1989
    Permit 8907265 $$$ $10,000

    Sheetrock for 3 bedrooms.

  5. May 1989
    Permit 8907287 $$$ $30,000

    Horizontal addition.

  6. May 2014
    Permit 201405125509 $$$ $3,100

    Remove decking boards and replace where dry rot is present, less than 50%. remove existing siding and replace dry rot approx. 100 linear feet, as stated in items #4a & 11a of report #14519b dated 5/7/14. not street visible at rear of structure.

  7. Feb 2017
    Permit 201702068666 $$$ $150,000

    1st floor: lower level @ rear. demolition wall for media rm, relocate bedroom, reconfigure rear doors, remodel bath, add interior stair. 2nd floor: relocate kitchen, demolition wall replace and add rear and side windows not visible from street.

  8. Sep 2025
    Permit 202509225786 $$$ $14,422

    Reroofing: remove and replace roofing material / existing roofing material (in-kind).

  9. Oct 2025
    Issued Permit 202510167540 $$$ $150,000

    Remove & replace approx 2750 sq ft redwood siding with hardie cement siding.install deck ledger @ rear elevation for roof deck to be built by others @ later date.

  10. Jan 2026
    Permit 202601053190 $$$ $4,210

    Replace 4 windows, non street facing, retrofit vinyl. u factor 0.30.

  11. Jun 2026
    Issued Permit 202606092817 $$$ $280,000

    Replace knobs and tubes wiring on 3rd floor, remodel 2 bathrooms on 3rd floor and 1 half bath 2nd floor. replace tub to shower on 3rd floor. replace insullation and plaster or drywall where there is water damage on all floors. replace flooring in 2nd and 3rd floors. no structural modification.

Nearby