Oct 1982
Additions alterations or repairs.
-
Apr 1983
Additions alterations or repairs.
-
Nov 1987
Repair cieling plaster; replace door with self closing device.
-
Dec 1987
Removal of concrete ramp as requested.
-
Mar 1988
Repair exist exterior steps & stringers.
-
Oct 1990
Comply with dahi complaint 07-17-86.
-
Jan 1995
Seismic bolting & upgrading, accessibility improvement ist fl.
-
Jul 1995
Parapet work only.
-
Sep 2005
Removal of existingstair as shown on sheet a2.3.
-
Dec 2005
Enlarge existing 2 car garage within the existing envelope of the building/ perform some preliminary demolition opening 3x3 holes at ceilings on each room or the building for future remodel.
-
Dec 2005
Phase i of remodeling of existing building. remodeling of existing bedrooms & bathrooms on 2nd floors. no exterior work. work on 1st floor to remove 1/2 bath, closet & a wall.
-
Jan 2006
Remove brick foundation & replace it with a concrete foundation + replace partition walls + replace center support beam /wall.
-
Sep 2006
Enlarge a section of the building on the north side to create a new set of stairs to connect all floors.
-
Feb 2008
Int. alterations to existing4 story building, new systems, minor ext. alterations, all int. walls removed. 1st floor.: 2new windows added & 11 to be replaced; 2nd. floor.: 7new windows & 8 to be replaced; 3rd floor.: 6new windows & 9 to be replaced.
-
Mar 2008
Replace cracked slab with new slab on grade & grade beam.
-
Apr 2008
To install new interior elevator at all floors.
-
Jun 2008
Replacing roof shingles including composition shingles.
-
Oct 2008
Comply (partially) with nov# 200802064121 to restore roof to existing, original condition as per request by dcp. lower approx 21" per city planning approval. additional permit will be filed to comply with n.o.v.
-
Dec 2008
Full installation of nfpa 13 fire sprinkler system throughout the building total 111 sprinkler heads. ord. 1 for garage, light haz for residential- includes new underground & 2" inches combo meter.
-
Mar 2009
To rebuilt and enlarge existing dormer on existing roof and top floor area only.
-
Aug 2009
To obtain final inspection for work approved under permit application 200803066540; sp insp required.
-
Aug 2009
To obtain final inspection for work approved under permit application 200812047794; all work has been completed.
-
Aug 2009
To obtain final inspection for work approved under permit application 200810083709; all work has been completed.
-
Oct 2019
Remodel of existing entry level including associated structural work. bath remodel and new stair connecting 1-4th levels. new steel door at 2nd level.
DBI holds 36 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 36. 6 of them are nominal $1 street-space or sidewalk permits.