Tobin House
1969 California Street · Pacific Heights
-
July 1911
M. H. de Young, founder of the San Francisco Chronicle, bought lots 15 and 16 of block 649, this lot among them, next to his own estate on lots 17 to 20; they were still unbuilt.
-
August 1911
De Young deeded the two empty lots to his daughters Helen de Young Cameron and Constance de Young Tobin, offering to build them houses; nothing was built for three years.
-
July 1914
Willis Polk filed the building permit (No. 57083) for the house, for Joseph O. Tobin.
-
1915
Designed by architect Willis Polk.
-
1915
The house was fitted with white enamel bedroom walls, tiled bathrooms, central heating, a built-in vacuum-cleaning system and hot water, and was the most modern house on the block.
-
1915
Built to Willis Polk's design on a lot beside the de Young mansion at 1919 California Street, given by M. H. de Young, the Chronicle's co-founder, to his daughter Constance and her husband Joseph O. Tobin: three storeys and a basement in Tudor Gothic, cement plaster over metal lath, with a slate roof. Polk drew it as one of a pair joined by a full Gothic arch, and a bridge linked it to the de Young grounds; the twin was never built, and half the arch still stands at the west end of the front, a form unique in the city.
-
January 20, 1915
A second permit (No. 60360) revised the design to a slightly narrower, deeper house with a lower basement ceiling and taller first and second storeys.
-
1940
The de Young daughters sold their father's Victorian mansion next door to be demolished rather than become a boarding house, and the lot west of this house was sold too, ending any chance of Polk's twin. Constance Tobin bought back a strip of the estate that year, now the driveway, with a lamppost base that is the last trace of the de Young grounds.
-
1943
Constance Tobin sold the house to Gualtiero Bartalini, who ran it as a residential hotel mostly for people in the performing arts, ending its period of significance.
-
1943–1988
Bartalini opened up the interior with arches, painted it in bright colours, added a stair from the third floor to the second-floor bathroom, put handrails on the balcony balustrades and installed fire sprinklers; a planned conversion to apartments was never finished.
-
August 19, 1964
Photographed.
-
1988
Bartalini sold the house; over the next years several owners' plans to split it into apartments or replace the roof lapsed, and it stood largely empty and fell into disrepair.
-
1996
Deteriorated sections of the south wall and several windows were replaced.
-
1997
A permit for a parapet turned the old detached shed on the east side into a permanent one-storey wing finished to match the house, with French doors onto its roof.
-
Oct 1997
Repair southwall due to dry rot to same configuration.
-
Dec 1998
Increase valuation of work on #9812155.
-
1999–2008
The slate roof, copper coping, flashing and chimney pots were replaced in replica, the third-floor attic was fitted out as bedrooms, and the east-side and eighteen rear windows were renewed.
-
Jul 2002
Change fire sprinkler on 3rd floor due to t.i. per nfpai3r.
-
Jul 2002
Remodel existing 3rd floor bedrooms, bathrooms and playroom.
-
Feb 2004
Relocate mechanical room in basement interior nonstructural remodel in basement partial waterproof.
-
Jun 2005
Replace old windows on east side of house, side of house.
-
October 21, 2008
Designated San Francisco Landmark No. 260, Tobin House.
-
October 5, 2009
Listed on the National Register of Historic Places as the work of Willis Polk, a medieval English design that set the character of the block's building in the 1940s.
-
Jul 2010
To comply with complaint# 201055396 dated 7/6/2010. remove existing non fire rated window. install new fire rated window. patch and paint as needed.
-
Sep 2010
Remove wainscott in 3rd floor north bedrm and replace with sheet rock, repair interior trim as needed, paint new level 5 sheetr ock and existing trim approx 250 sq ft. new sheetrock.
-
Jun 2013
Remove existing closet system and install new. widen door to closet.
-
Jul 2014
Remove & replace drywall in dining room, living room & front room on 1st fl. to install & add recessed lighting.
-
Sep 2015
3 decks repair. 350sf/200sf/100sf: remove existing roofing materior at 2 decks at top floor. install new plywood & water proof. remove existing mater at 1 deck @ driveway. install new plywood & water proof. plywood to be replaced in-kind. nailing 10d, 6in edge, 12in fiald or match existing.
-
May 2016
Replace failed dining room french door in kind at rear of home, remove existing door, brake out stucco water proof opening install door patch stucco.
-
Sep 2017
Replace failed stucco accesories @ 5 chimneys - set up scaffold to access chimneys 2)remove rusted weep screeds and corner bead 3)install new copper or stainless accessories 4) install new paper sheathing 5) install lath, scratch and brown finish stucco coats to match existing 6) paint new stucco.
-
Oct 2017
Reverse swing on driveway side door: 1) remove existing door, 2) install matching clad door with in-swing. maher n/a.
-
Nov 2017
Demolish interior wall at basement & replace with 2 posts & a beam, opening up wall between existing storage and an existing bedroom which is to be converted to private office. n/a maher ordinance.
-
Jun 2021
To obtain final inspection for work approved under permit application 201711143982. all work is complete.
DBI holds 67 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 67. 21 of them are nominal $1 street-space or sidewalk permits. 8 expired permits are not shown.
Nearby
- 1915 California Street Same street
- Atherton House Same street
- 1991 California Street Same block
- 1844–1848 Pine Street Same block
- 1836 Pine Street Same block
- 1880 Pine Street Same block
- 1807 Octavia Street Around the corner
- 1801 Octavia Street Around the corner