2360 Pacific Avenue
Pacific Heights · San Francisco, CA 94115
-
1929
Designed by Edward G. Bolles and Albert Schroepfer — an unusual combination of the Mediterranean Revival style with Art Deco decoration and Churrigueresque detailing.
-
Oct 1981
Additions alterations or repairs.
-
Feb 1984
Install a solar water heater.
-
Mar 1994
Exterior restoration, structural steel reinforcement.
-
Feb 2002
Remove 2 existing bathroom with utility room/pwdrm and walk in closet/bld new kchn with cbnts/island/bathroom.
-
Mar 2002
Additional cost of job $15, 000 app#2002/02/01/8286.
-
Jul 2004
Reroofing.
-
Mar 2008
1st floor: remodel studio apartment on manager's unit - expand bath, replace ktichen cabients & appliances. add storage over bath. raise furred ceiling, interior work only. maintain 1 hour separation.
-
Jul 2008
One unit only: remodel kitchen, new cabinets, countertops, finishes. enlarge kitchen opening with archway, remove ponywall in kitchen. no structural work.
-
Dec 2013
One unit: replace cabinets, add washer/dryer, now vented, all existing walls to remain, no change to layout.
-
Nov 2014
Remodel kitchen and 2 baths. new cabinets and appliances. tile and countertop. new toilet, sink, tile.
-
Jan 2015
One unit - replace bathroom fixtures in 2 baths remodels, non-structural. n/a maher ordinance.
-
Nov 2015
One unit: bathroom remodel.
-
Nov 2015
One unit: bathroom remodel.
-
Sep 2017
#502 -remodel 2 bathrooms in kind & place.
-
Jun 2018
One unit - renovate 3 existing bathrooms, expand bath #3. renovate existing kitchen. open access to back staircase from main hall to create shorter path of travel.
-
Jul 2018
Repair facade to match existing textures, design, and decorative elements. replace bricks in kind. maher na.
-
Oct 2018
Revision: completion of work commenced under bpa #201807305930.
-
Jan 2019
One unit: bathroom remodel, change tile, cabinets, toilet, sink.
-
Jun 2019
Repointing of west elevation. no replacement of brick. no work to front elevation. comply with complaint 201962561.
-
Sep 2020
Renovation of 2 existing bathrooms andding closes. removal of two partitions in dining room. ** maher: n/a **.
-
Jul 2021
Convert 724 sq ft of existing unconditioned mechanical space on the roof into an adu. 6 story multi-family existing building, mechanical room is not visable from the street.
-
Apr 2023
Fire alarm system replacement and new lf horns to meet sffc 2022 sec 1103.7.6.1.
-
2024
Evaluated in the city's citywide survey of large apartment buildings as intact in every one of the seven respects the register criteria weigh, and as appearing eligible under Criterion C/3.
-
Mar 2024
Removal and replacement of degraded facade steel mullians in kind.
-
Oct 2024
Repair of water-damaged steel beam on west exterior wall, remove bricks (about 40'x 2') to expose rusted beam, grind to remove rust, treat metal with rust converter, and replace brick and mortar to match, paint window trim and wall.
-
Mar 2025
One unit: renovating 2 existing bathrooms renovating existing kitchen adding with d to unit.
DBI holds 49 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 49. 17 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer and the early residents. Submit an update