2001 Van Ness Avenue
Pacific Heights · San Francisco, CA 94109
-
1919
Recorded in the city's survey of the Van Ness Avenue automobile corridor as an early Lincoln showroom; altered. Designed by MacDonald and Kahn.
-
Mar 1982
Additions alterations or repairs.
-
Mar 1982
Additions alterations or repairs.
-
Dec 1984
Install (2) new restroom, drywall partition.
-
Sep 1986
Additions alterations or repairs.
-
Nov 1990
Interior partitions and finishes per plans.
-
May 1995
Upgrd bathrm to handicap accss, new tbar ceiling &new light.
-
Jul 1995
Reroofing.
-
Sep 1997
Vertical addition.
-
Apr 1998
Remove existing finishes provide new finishes partition storefrnt.
-
May 1998
5 signs.
-
Apr 2009
#401- commercial tenant improvement. demolish partition walls & build new walls. interior finish work, plumbing, electrical, patch ceiling, new flooring, new cabinetry.
-
2010
Identified in the city's survey of the Van Ness Avenue automobile corridor but not formally evaluated on a state historic resource form.
-
Oct 2014
Cosmetic remodel of subway sandwich srore including replacement of e wall finishes, floor tiles new soofit at ceiling, relocate store front meet curret ada requirement. disabledd access upgrades per cbc 2013 1134b.
-
Sep 2016
New entry door.
-
Aug 2017
Reroofing.
-
Mar 2022
New fire alarm system installation.
-
Apr 2022
3/f suite 300: interior t.i includeds new non-load bearing partitions, ceilings, finishes, and mep. to comply with nov 202185634.
-
Jul 2022
Exterior facade improvement. sign is under separate permit.
-
Nov 2022
3/f: t.i., modificaiton of existing f/a system. ref bpa#202203280984 & #202211025711.
-
Nov 2023
T.i.suite 407: scope of work shall include new interior non-bearing partition walls, acoustic ceilings, built-in casemwork. insterior finishes, lighting, power/data, hvac distribution & associated.
-
Jan 2024
Suite #407: commercial ti - new lighting /power off existing subpanel.
-
May 2024
4/f #402: 750 sq ft interior office tenant improvement for an existing dental office. new interior non-bearing partition walls, acoustic ceilings, interior finishes, lighting, power, and data.
-
Aug 2025
Administrative permit to document 7210 sq ft tenant space change of use from retail to martial arts studio (boxing gym). new ada restroom within existing tenant space; new 2hr full ht demising wall separation: associated electrical.
-
Nov 2025
Unit grb: convert existing standard show stall into ada shower stall.
-
Dec 2025
Suite 100: interior non structural, wall, floor and exposed ceiling finishes. mep & fire deferred.
-
Feb 2026
Ref 202512292884 to include mep work. to include replace water fountain and fixtures and finishes.
DBI holds 63 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 63. 8 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update