1945
Built as an industrial building, recorded as occupied by L & H Paint Products.
-
Jun 1991
Demolish storage building.
-
Nov 1993
Remodel existing manfacturure space for n/photographic studio.
-
May 2012
Set vacant space to accomodate retail coffee. no seating counter, shelves, sinks, equipment hookup. mep under separate permit.
-
Jul 2012
Add 2 sprinkler heads at loading dock to accomodate new wall.
-
Feb 2014
Replace existing garage door at cafe entry and loading area on ground level with new custom glazed steel entry door and loading door. compliance with ordinance no. 155-13 not required.
-
Aug 2014
@003k%ua85da.
-
Oct 2015
Retro fit windows, sides of building (un-conditioned warehouses) only. in kind window replacement.
-
Apr 2016
Reroofing.
-
Mar 2017
Reroute existing leaking 6" underground main to run overhead, add new backflow preventer, tie in back to existing system. n/a ordinance #155-13.
-
Sep 2019
Change of occupancy to metal & wood work manufacturing. remove existinginterior construct new improvements in office & industrial space with assocciated support functions including open office, testing & assembly, warehouse and other support functions. replace existing stair with deferred permit.
-
Nov 2019
Phase 2: remove existing interior improvements. contruct new interior improvements in industrial space with associated support functions including open office, breakroom (non cooking), restrooms, testing & assembly. extension of mezzanine floor. (phase 1 - ref permit application 201909242541).
-
Nov 2019
Relocate 4 sprinklers and demolition 2 drops ref 201909242541.
-
Nov 2019
Title 24 - added power & lighting, electrical panel upgrades. ref pa 2019-0924-2541.
-
Feb 2020
Fire alarm work to add a sprinkler monitoring panel that includes a smoke detector for an i.t room and 4 fan unit duct detectors. ref permit application 201909242541.
-
Feb 2020
Fire sprinkler: add heads under hvac duct, 5 rel0cate lines (see as built). revise as built per fire marshall request.
-
Dec 2022
Minor demolition (remove prior interior improvements) and provide new infill walls at existing accessory use storage/loading dock area. no structural, mechanical/plumbing no electrical work.
-
Oct 2024
Upgrade existing sprinkler monitoring system.
-
Sep 2025
As built change log 9/22/2025 per inspector ref permit application 202410243602 updated sequence of operation to include closing of fsd's.
3 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Not yet documented: the architect and builder and the early tenants. Submit an update