37.7644, −122.3952 A locator map appears here once a Mapbox token is configured.

150 Mississippi Street

Potrero Hill · San Francisco, CA 94107

  • Built 1945
  • Industrial building
  • Zoned M1
  • District 10
  • Historic status: not a historical resource
37.7644, −122.3952 Street View appears here once a Google Maps embed key is configured.
13,679 sq ftBuilding area
12,450 sq ftLot area
13Rooms · 3 baths
  1. 1945

    Built as an industrial building, recorded as occupied by L & H Paint Products.

    Showplace Square / Northeast Mission Historic Resource Survey, adopted 2011
  2. Jun 1991

    Demolish storage building.

    Expired Permit 9111404
  3. Nov 1993

    Remodel existing manfacturure space for n/photographic studio.

    Complete Permit 9320701 $$$ $60,000
  4. May 2012

    Set vacant space to accomodate retail coffee. no seating counter, shelves, sinks, equipment hookup. mep under separate permit.

    Complete Permit 201205210833 $$$ $15,000
  5. Jul 2012

    Add 2 sprinkler heads at loading dock to accomodate new wall.

    Complete Permit 201207255784 $$$ $400
  6. Feb 2014

    Replace existing garage door at cafe entry and loading area on ground level with new custom glazed steel entry door and loading door. compliance with ordinance no. 155-13 not required.

    Cancelled Permit 201402249202 $$$ $10,000
  7. Aug 2014

    @003k%ua85da.

    Cancelled Permit 201408214448 $$$ $40,000
  8. Oct 2015

    Retro fit windows, sides of building (un-conditioned warehouses) only. in kind window replacement.

    Issued Permit 201510281037 $$$ $73,434
  9. Apr 2016

    Reroofing.

    Issued Permit 201604275869 $$$ $30,000
  10. Mar 2017

    Reroute existing leaking 6" underground main to run overhead, add new backflow preventer, tie in back to existing system. n/a ordinance #155-13.

    Issued Permit 201703282544 $$$ $10,000
  11. Sep 2019

    Change of occupancy to metal & wood work manufacturing. remove existinginterior construct new improvements in office & industrial space with assocciated support functions including open office, testing & assembly, warehouse and other support functions. replace existing stair with deferred permit.

    Complete Permit 201909242541 $$$ $150,000
  12. Nov 2019

    Phase 2: remove existing interior improvements. contruct new interior improvements in industrial space with associated support functions including open office, breakroom (non cooking), restrooms, testing & assembly. extension of mezzanine floor. (phase 1 - ref permit application 201909242541).

    Complete Permit 201911187541 $$$ $1,000,000
  13. Nov 2019

    Relocate 4 sprinklers and demolition 2 drops ref 201909242541.

    Complete Permit 201911197618 $$$ $12,280
  14. Nov 2019

    Title 24 - added power & lighting, electrical panel upgrades. ref pa 2019-0924-2541.

    Complete Permit 201911278353 $$$ $100,000
  15. Feb 2020

    Fire alarm work to add a sprinkler monitoring panel that includes a smoke detector for an i.t room and 4 fan unit duct detectors. ref permit application 201909242541.

    Complete Permit 202002033328 $$$ $11,800
  16. Feb 2020

    Fire sprinkler: add heads under hvac duct, 5 rel0cate lines (see as built). revise as built per fire marshall request.

    Complete Permit 202002265444 $$$ $1
  17. Dec 2022

    Minor demolition (remove prior interior improvements) and provide new infill walls at existing accessory use storage/loading dock area. no structural, mechanical/plumbing no electrical work.

    Complete Permit 202212087880 $$$ $20,000
  18. Oct 2024

    Upgrade existing sprinkler monitoring system.

    Complete Permit 202410243602 $$$ $7,000
  19. Sep 2025

    As built change log 9/22/2025 per inspector ref permit application 202410243602 updated sequence of operation to include closing of fsd's.

    Complete Permit 202509256144 $$$ $1

3 nominal $1 street-space or sidewalk permits are omitted from the timeline.

Not yet documented: the architect and builder and the early tenants. Submit an update